Quantifying the Impact of Technology Utilization on Schedule and Cost Performance in Construction Projects

被引:0
|
作者
Salih, Fareed [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Acad Partnerships, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[3] Missouri Univ Sci & Technol, Construct Engn & Management, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, 228 Butler Carlton Hall,1401 N Pine St, Rolla, MO 65401 USA
关键词
MANAGEMENT; PREDICTION; BIM;
D O I
10.1061/JCEMD4.COENG-14679
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
There has been a plethora of research on the performance of schedule and cost in construction projects. However, current research falls short in investigating the combined contribution of different construction technologies on project performance metrics. Specifically, none of the previous efforts have used integrated earned value management (EVM) parameters and utilized construction technologies to assess project schedule and cost performance. This paper fills this knowledge gap. To this end, a multistep research methodology was employed to (1) explore the utilization ratings of 13 construction technologies based on data collected from 52 industry experts; (2) rank these technologies in terms of their contribution to schedule and cost savings; (3) map the utilization ratings of construction technologies to schedule and cost variances by leveraging data from 48 construction projects with varying levels and scopes of technology integration to gauge the impact of using these technologies; and (4) develop an associated decision-support model that underwent rigorous verification under extreme conditions and sensitivity analysis. This study makes a noteworthy contribution to the existing body knowledge, revealing that the major drivers for schedule savings are building information modeling (BIM), unmanned aerial vehicles (UAVs), and augmented/virtual reality (AR/VR), while additive manufacturing (AM), digital twin (DT), and Internet of Things (IoT) are the most significant contributors to cost savings. Moreover, the study reveals strong correlations between various technologies, such as UAVs and laser scanning, geographic information system (GIS) and GPS, AR/VR and digital twins, as well as robotics/automation and AR/VR. Furthermore, the study introduces a novel model that enhances the prediction of project performance, specifically in terms of schedule and cost variations resulting from the adoption of various construction technologies. Eventually, it improves the decision-making process related to the deployment of the investigated construction technologies.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] PREDICTING THE SCHEDULE AND COST PERFORMANCE IN PUBLIC SCHOOL BUILDING PROJECTS IN TAIWAN
    Juan, Yi-Kai
    Liou, Ling-Er
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (01) : 51 - 67
  • [32] Design Changes in Construction Projects - Causes and Impact on the Cost
    Aslam, Mughees
    Baffoe-Twum, Edmund
    Saleem, Farhan
    [J]. CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (07): : 1647 - 1655
  • [33] Schedule health assessment of construction projects
    Bragadin, Marco Alvise
    Kahkonen, Kalle
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (12) : 875 - 897
  • [34] Inhibiting Factors of Cost Performance in UAE Construction Projects
    Alhammadi, Ahmed Salem Ahmed Marey
    Memon, Aftab Hameed
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 126 - 132
  • [35] EFFECT OF DESIGN MANAGEMENT ON COST PERFORMANCE OF CONSTRUCTION PROJECTS
    Anita
    Doloi, Hemanta
    [J]. IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : 1347 - 1352
  • [36] Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance
    Hwang, Bon-Gang
    Zhu, Lei
    Wang, Yinglin
    Cheong, Xinyi
    [J]. PROJECT MANAGEMENT JOURNAL, 2017, 48 (04) : 67 - 79
  • [37] Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
    Larsen, Jesper Kranker
    Shen, Geoffrey Qiping
    Lindhard, Soren Munch
    Brunoe, Thomas Ditlev
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (01)
  • [38] The impact of make-ready process on project cost performance in heavy civil construction projects
    Kim, Yong-Woo
    [J]. PRODUCTION PLANNING & CONTROL, 2019, 30 (13) : 1064 - 1071
  • [39] Critical factors affecting schedule performance: Evidence from Indian construction projects
    Iyer, K. C.
    Jha, K. N.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (08) : 871 - 881
  • [40] Prediction of schedule performance of Indian construction projects using an artificial neural network
    Jha, Kumar Neeraj
    Chockalingam, Ct
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (09) : 901 - 911