PREDICTING THE SCHEDULE AND COST PERFORMANCE IN PUBLIC SCHOOL BUILDING PROJECTS IN TAIWAN

被引:5
|
作者
Juan, Yi-Kai [1 ]
Liou, Ling-Er [1 ,2 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Architecture, Taipei, Taiwan
[2] Minist Educ, Dept Secretarial Affairs, Taipei, Taiwan
关键词
public school building projects (PSBPs); project performance; Fuzzy Delphi Method (FDM); association rules; Artificial Neural Network (ANN); CRITICAL SUCCESS FACTORS; ASSOCIATION RULES; CONSTRUCTION PROJECTS; NEURAL-NETWORK;
D O I
10.3846/jcem.2021.15853
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Ministry of Education (MOE) of Taiwan invests about NTD 30 billion a year in Public School Building Projects (PSBPs). However, 95% of the PSBPs have been extended and have incurred increased costs. A PSBP performance evaluation and prediction system was established by using the Fuzzy Delphi Method (FDM), association rules and an Artificial Neural Network (ANN). Sixty-two Taiwanese PSBPs were used as the samples, while eleven high correlation factors that influence the project performance of PSBPs were defined, and the reasons leading to the poor project performance were discussed in this study. Moreover, the results of the test cases operated by ANN showed that the accuracy rate for schedule and cost variability predictions can reach 84%. The high accuracy rate indicated the reliability of priority control for high-risk projects in the future. The proposed approach can be provided to clients, design and construction firms, and project managers to understand the project performance in real time and to establish a dynamic tracking review and response measures for improving the overall project satisfaction.
引用
收藏
页码:51 / 67
页数:17
相关论文
共 50 条
  • [1] Approximately predicting the cost and duration of school reconstruction projects in Taiwan
    Chen, Wei Tong
    Huang, Ying-Hua
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (12) : 1231 - 1239
  • [2] Effect of Change Orders on Cost and Schedule Overruns of School Building Renovation Projects
    Shrestha, Pramen P.
    Zeleke, Haileab
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (04)
  • [3] Cost and Schedule Performance Analysis of Transportation Public-Private Partnership Projects
    Ramsey, David
    El Asmar, Mounir
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [4] Predicting Cost and Schedule Performance of Green Building Projects Based on Preproject Planning Efforts Using Multiple Linear Regression Analysis
    Khun-anod, Kritsada
    Limsawasd, Charinee
    Athigakunagorn, Nathee
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2023, 29 (03)
  • [5] Predicting Cost and Schedule Performance of Green Building Projects Based on Preproject Planning Efforts Using Multiple Linear Regression Analysis
    Khun-Anod, Kritsada
    Limsawasd, Charinee
    Athigakunagorn, Nathee
    [J]. Journal of Architectural Engineering, 2023, 29 (03):
  • [6] Using Project Team Integration to Predict Cost and Schedule Performance in Public Transportation Projects
    Silva, Arlys
    Harper, Christofer
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT, 2018, : 680 - 690
  • [7] Cost and Schedule Monitoring of Industrial Building Projects: Case Study
    De Marco, Alberto
    Briccarello, Diego
    Rafele, Carlo
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (09): : 853 - 862
  • [8] Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects
    Shrestha, Pramen P.
    Fathi, Medya
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (03)
  • [9] Cost, Change Order, and Schedule Performance of Highway Projects
    Shrestha, Bandana
    Shrestha, Pramen P.
    Maharjan, Ruiko
    Gransberg, Douglas
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (01)
  • [10] Analysis of cost and schedule performance of international development projects
    Ahsan, Kamrul
    Gunawan, Indra
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (01) : 68 - 78