共 50 条
- [5] Predicting Cost and Schedule Performance of Green Building Projects Based on Preproject Planning Efforts Using Multiple Linear Regression Analysis [J]. Journal of Architectural Engineering, 2023, 29 (03):
- [6] Using Project Team Integration to Predict Cost and Schedule Performance in Public Transportation Projects [J]. CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT, 2018, : 680 - 690
- [7] Cost and Schedule Monitoring of Industrial Building Projects: Case Study [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (09): : 853 - 862