Critical factors affecting schedule performance: Evidence from Indian construction projects

被引:134
|
作者
Iyer, K. C.
Jha, K. N.
机构
[1] Indian Inst Technol, Dept Management Studies, New Delhi 110016, India
[2] Indian Inst Technol, Dept Civil Engn, New Delhi 110016, India
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:8(871)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Over 40% of Indian construction projects are facing time overrun ranging from I to 252 months; the reasons for which are being studied by researchers to suggest possible remedial measures. This paper identifies 55 attributes responsible for impacting performance of the projects. These attributes were then presented to Indian construction professionals in the form of a questionnaire. Statistical analysis of responses on the attributes segregated them into distinct sets of success attributes and failure attributes. Factor analysis of sets of success attributes and failure attributes separately grouped them into six critical success factors and seven critical failure factors. In order to understand the extent of contribution these factors have on the outcome of a construction project, a second stage questionnaire survey was also undertaken. The analyses of responses of the second stage questionnaire led us to conclude that two success factors and one failure factor: commitment of project participants; owner competence; and conflict among project participants contribute significantly in enhancement of current performance level of the project. The extent of their contribution has, however, been observed to vary for a given level of project performance. The analyses results are expected to help project professionals to focus on a few factors and get the optimum results rather than giving attention to all the factors and not getting the proportionate results.
引用
收藏
页码:871 / 881
页数:11
相关论文
共 50 条
  • [1] Critical factors affecting schedule performance A case of Ethiopian public construction projects - engineers' perspective
    Sinesilassie, Ephrem Girma
    Tabish, Syed Zafar Shahid
    Jha, Kumar Neeraj
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 757 - 773
  • [2] Critical factors affecting quality performance in construction projects
    Jha, K. N.
    Iyer, K. C.
    [J]. TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2006, 17 (09) : 1155 - 1170
  • [3] Identifying the critical factors affecting schedule performance of public housing projects
    Hwang, Bon-Gang
    Zhao, Xianbo
    Ng, Si Yi
    [J]. HABITAT INTERNATIONAL, 2013, 38 : 214 - 221
  • [4] Factors affecting cost and time performance on highway construction projects: evidence from Thailand
    Meeampol, S.
    Ogunlana, S.
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2006, 11 (01) : 3 - +
  • [5] An analytical study of critical factors affecting contractor efficiency in construction projects in Indian scenario
    Deep, Shumank
    Simon, Laura
    Asim, Mohd
    Rahimzadeh, Ali
    Al-Hamdani, Sulala
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2018, 10 (01): : 1794 - 1802
  • [6] Critical success factors affecting project success in construction projects: A contemporary Indian perspective
    Moza, Amit
    Paul, Virendra Kumar
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2024, 9 (02) : 183 - 196
  • [7] Analysing factors affecting delays in Indian construction projects
    Doloi, Hemanta
    Sawhney, Anil
    Iyer, K. C.
    Rentala, Sameer
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (04) : 479 - 489
  • [8] Critical factors affecting cost performance: a case of Ethiopian public construction projects
    Sinesilassie, E. G.
    Tabish, S. Z. S.
    Jha, K. N.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (02) : 108 - 119
  • [9] In-depth analysis of critical factors affecting Iraqi construction projects performance
    Mohammed, Safaa
    Hasan, Afrah
    [J]. OPEN ENGINEERING, 2024, 14 (01):
  • [10] Factors Affecting the Performance of Construction Projects in Pakistan
    Iqbal, Muhammad
    Khan, Imtiaz
    Ahmad, Fawad
    Ahad, Muhammad Zeeshan
    Munir, Mehre
    [J]. JOURNAL OF MECHANICS OF CONTINUA AND MATHEMATICAL SCIENCES, 2019, 14 (03): : 336 - 358