Group Scheduling and Due Date Assignment Without Restriction on a Single Machine

被引:3
|
作者
Chen, Ying [1 ]
Cheng, Yongxi [1 ,2 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
[2] State Key Lab Mfg Syst Engn, Xian 710049, Peoples R China
基金
中国国家自然科学基金;
关键词
Single machine scheduling; Due date assignment; Group technology; MULTIPLE;
D O I
10.1007/978-3-030-85906-0_28
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider a single machine scheduling problem in which the scheduler decides optimal due dates for different jobs under a group technology environment, in which the jobs are classified into groups in advance due to their production similarities, and jobs in the same group are required to be processed consecutively to achieve efficiency of high-volume production. The goal is to determine an optimal job schedule together with a due date assignment strategy to minimize an objective function that includes earliness, tardiness, due date assignment and flow time costs. The due date assignment is without restriction, that is, it is allowed to assign different due dates to jobs within one group. We present structural results that fully characterize the optimal schedule, and give an optimal O(n log n) time algorithm for this problem.
引用
收藏
页码:250 / 257
页数:8
相关论文
共 50 条
  • [41] Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance
    Suh-Jenq Yang
    Chou-Jung Hsu
    Dar-Li Yang
    [J]. Optimization Letters, 2012, 6 : 1855 - 1873
  • [42] A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights
    Sun, Xinyu
    Geng, Xin-Na
    Wang, Jiayin
    Liu, Tao
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (02)
  • [43] Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance
    Yang, Suh-Jenq
    Hsu, Chou-Jung
    Yang, Dar-Li
    [J]. OPTIMIZATION LETTERS, 2012, 6 (08) : 1855 - 1873
  • [44] A note on due-date assignment and single-machine scheduling with deteriorating jobs and learning effects
    Kuo, W-H
    Yang, D-L
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (01) : 206 - 210
  • [45] SINGLE-MACHINE SCHEDULING AND DUE DATE ASSIGNMENT WITH REJECTION AND POSITION-DEPENDENT PROCESSING TIMES
    Zhao, Chuanli
    Yin, Yunqiang
    Cheng, T. C. E.
    Wu, Chin-Chia
    [J]. JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2014, 10 (03) : 691 - 700
  • [46] Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs
    Zhao, Chuanli
    Hsu, Chou-Jung
    Cheng, Shuenn-Ren
    Yin, Yunqiang
    Wu, Chin-Chia
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2014, 248 : 503 - 510
  • [47] Multi-agent single-machine scheduling and unrestricted due date assignment with a fixed machine unavailability interval
    Yin, Yunqiang
    Wang, Wenyi
    Wang, Dujuan
    Cheng, T. C. E.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 111 : 202 - 215
  • [48] Single machine group scheduling jobs with resource allocations subject to unrestricted due date assignments
    Wang, Xuyin
    Liu, Weiguo
    [J]. JOURNAL OF APPLIED MATHEMATICS AND COMPUTING, 2024,
  • [49] Single machine group scheduling to minimize mean flow time subject to due date constraints
    Pan, JCH
    Wu, CC
    [J]. PRODUCTION PLANNING & CONTROL, 1998, 9 (04) : 366 - 370
  • [50] Due-date assignment and parallel-machine scheduling with deteriorating jobs
    Cheng, T. C. E.
    King, L. Y.
    Ng, C. T.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (08) : 1103 - 1108