We consider single-machine scheduling and slack due-date assignment problems simultaneously with the position-dependent aging effect and deteriorating maintenance. In order to counteract the aging effect on the machine, we assume that at most one maintenance is allowed throughout the planning horizon and the maintenance can be performed immediately after the processing of any job is completed. The maintenance duration is dependent on its starting time. The objective is to find jointly the optimal common slack time, the optimal maintenance position, and the optimal schedule such that the sum of the total earliness, the total tardiness, and the common slack time costs is minimized. We propose polynomial time algorithms for all the problems studied.
机构:
E China Inst Technol, State Key Lab Breeding Base Nucl Resources & Envi, Nanchang, Peoples R China
E China Inst Technol, Coll Sci, Nanchang, Peoples R ChinaE China Inst Technol, State Key Lab Breeding Base Nucl Resources & Envi, Nanchang, Peoples R China
Yin, Yunqiang
Wu, Wen-Hung
论文数: 0引用数: 0
h-index: 0
机构:
Kang Ning Jr Coll, Dept Business Adm, Taipei, TaiwanE China Inst Technol, State Key Lab Breeding Base Nucl Resources & Envi, Nanchang, Peoples R China
Wu, Wen-Hung
Cheng, T. C. E.
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R ChinaE China Inst Technol, State Key Lab Breeding Base Nucl Resources & Envi, Nanchang, Peoples R China