共 50 条
- [5] Parallel machine batch scheduling for due date constraints and setup time [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (01): : 111 - 117
- [9] Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2023, 121