Capital- and resource-constrained project scheduling with net present value optimization

被引:31
|
作者
Leyman, Pieter [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Technol & Operat Management Area, Reep 1, B-9000 Ghent, Belgium
[3] UCL, UCL Sch Management, Gower St, London WC1E 6BT, England
关键词
Project scheduling; Net present value; Capital; Metaheuristics; ONE PROGRAMMING APPROACH; CASH FLOWS; SCATTER SEARCH; PAYMENTS; MAXIMIZE; ALGORITHM; NETWORKS; MODELS;
D O I
10.1016/j.ejor.2016.07.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we study the capital-constrained project scheduling problem with discounted cash flows (CCPSPDC) and the capital- and resource-constrained project scheduling problem with discounted cash flows (CRCPSPDC). The objective of both problems is to maximize the project net present value (NPV), based on three cash flow models. Both problems include capital constraints, which force the project to always have a positive cash balance. Hence, it is crucial to schedule activities in such an order that sufficient capital is available. The contribution of this paper is threefold. First, we propose three distinct cash flow models, which affect the capital availability during the project. Second, we introduce two new schedulers to improve capital feasibility, one for the CCPSPDC and one for the CRCPSPDC. The schedulers focus on delaying sets of activities, which cause cash outflows to be received at later time instances, in order to reduce capital shortages. Both schedulers are implemented as part of three metaheuristics from literature, in order to compare the metaheuristics' performance. Two penalty functions have been included, one to improve capital feasibility and another to improve deadline feasibility. Third, the proposed procedure has been tested on a large dataset and the added value of the schedulers has been validated. Managerial insights are provided with respect to the impact of key parameters. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:757 / 776
页数:20
相关论文
共 50 条
  • [41] A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
    Vanhoucke, Mario
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (07) : 1983 - 2001
  • [42] Extending the Multimode Resource-Constrained Project Scheduling Problem by Including Value Considerations
    Balouka, Noemie
    Cohen, Izak
    Shtub, Avraham
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2016, 63 (01) : 4 - 15
  • [43] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [44] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [45] Ant colony optimization for resource-constrained project scheduling with generalized precedence relations
    Luo, SP
    Wang, C
    Wang, JW
    15TH IEEE INTERNATIONAL CONFERENCE ON TOOLS WITH ARTIFICIAL INTELLIGENCE, PROCEEDINGS, 2003, : 284 - 289
  • [46] Cat swarm Optimization-based schemes for resource-constrained project scheduling
    Xu, Long
    Hu, Wenbin
    ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 251 - 258
  • [47] Particle swarm optimization-based schemes for resource-constrained project scheduling
    Zhang, H
    Li, XD
    Li, H
    Huang, FL
    AUTOMATION IN CONSTRUCTION, 2005, 14 (03) : 393 - 404
  • [48] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Wanlin Liu
    Li Ge
    Chunli Qu
    Shun Yang
    KSCE Journal of Civil Engineering, 2024, 28 : 15 - 28
  • [49] Permutation-based particle swarm optimization for resource-constrained project scheduling
    Zhang, H
    Li, H
    Tam, CM
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2006, 20 (02) : 141 - 149
  • [50] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976