Particle swarm optimization-based schemes for resource-constrained project scheduling

被引:136
|
作者
Zhang, H [1 ]
Li, XD [1 ]
Li, H [1 ]
Huang, FL [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
关键词
particle swarm optimization; project scheduling; resource-constrained; priority-based representation; permutation-based representation;
D O I
10.1016/j.autcon.2004.08.006
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Particle swarm optimization (PSO) performed through particle flying along the trajectory that will be continuously updated is based to develop a solution-solving scheme for the resource-con strained project scheduling problem (RCPSP). The potential solution to the RCPSP in view of minimizing project duration is represented by the multidimensional particle, where two solution representations, i.e., priority-based representation and permutation-based representation, are respectively considered. The frameworks of the PSOs for the RCPSP according to the two solution representations are developed. Experimental analyses are presented to investigate the performance of the proposed PSO-based methodology, including comparison of the two representations and comparison with other approaches for the RCPSP. The study aims at providing an alternative means for the RCPSP by utilizing the features of PSO, such as particle-updating mechanism that may benefit from the searching experience of one particle itself or the best of all particles in the swarm. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:393 / 404
页数:12
相关论文
共 50 条
  • [1] Cat swarm Optimization-based schemes for resource-constrained project scheduling
    Xu, Long
    Hu, Wenbin
    [J]. ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 251 - 258
  • [2] Particle swarm optimization-based schemes for resource-constrained project scheduling (vol 14, pg 393, 2005)
    Zhang, H
    Li, XD
    Li, H
    Huang, FL
    [J]. AUTOMATION IN CONSTRUCTION, 2006, 15 (02) : 252 - 252
  • [3] Particle swarm optimization for resource-constrained project scheduling
    Department of Building and Construction, City University of Hong Kong, Tat Avenue, Kowloon, Hong Kong
    不详
    [J]. Int. J. Proj. Manage., 2006, 1 (83-92):
  • [4] Permutation-based particle swarm optimization for resource-constrained project scheduling
    Zhang, H
    Li, H
    Tam, CM
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2006, 20 (02) : 141 - 149
  • [5] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Jia, Qiong
    Seo, Yoonho
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2627 - 2638
  • [6] Hybrid particle swarm optimization for preemptive resource-constrained project scheduling
    Shou, Yongyi
    Li, Ying
    Lai, Changtao
    [J]. NEUROCOMPUTING, 2015, 148 : 122 - 128
  • [7] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Qiong Jia
    Yoonho Seo
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 67 : 2627 - 2638
  • [8] Particle swarm optimization for resource-constrained project scheduling problems with activity splitting
    Deng, Lin-Yi
    Lin, Yan
    [J]. Kongzhi yu Juece/Control and Decision, 2008, 23 (06): : 681 - 684
  • [9] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    [J]. CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [10] Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
    Chen, Ruey-Maw
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 7102 - 7111