Particle swarm optimization for resource-constrained project scheduling problems with activity splitting

被引:0
|
作者
Deng, Lin-Yi [1 ,2 ]
Lin, Yan [2 ]
机构
[1] School of Electronic and Information Engineering, Dalian University of Technology, Dalian 116024, China
[2] Engineering Center of Ship CAD, Dalian University of Technology, Dalian 116024, China
来源
Kongzhi yu Juece/Control and Decision | 2008年 / 23卷 / 06期
关键词
14;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:681 / 684
相关论文
共 50 条
  • [1] Particle swarm optimization for resource-constrained project scheduling
    Department of Building and Construction, City University of Hong Kong, Tat Avenue, Kowloon, Hong Kong
    不详
    [J]. Int. J. Proj. Manage., 2006, 1 (83-92):
  • [2] Hybrid particle swarm optimization for preemptive resource-constrained project scheduling
    Shou, Yongyi
    Li, Ying
    Lai, Changtao
    [J]. NEUROCOMPUTING, 2015, 148 : 122 - 128
  • [3] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Jia, Qiong
    Seo, Yoonho
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2627 - 2638
  • [4] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Qiong Jia
    Yoonho Seo
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 67 : 2627 - 2638
  • [5] Using Particle Swarm Optimization to Solve Resource-constrained Scheduling Problems
    Lo, Shih-Tang
    Chen, Ruey-Maw
    Shiau, Der-Fang
    Wu, Chung-Lun
    [J]. 2008 IEEE CONFERENCE ON SOFT COMPUTING IN INDUSTRIAL APPLICATIONS SMCIA/08, 2009, : 38 - +
  • [6] Permutation-based particle swarm optimization for resource-constrained project scheduling
    Zhang, H
    Li, H
    Tam, CM
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2006, 20 (02) : 141 - 149
  • [7] Particle swarm optimization-based schemes for resource-constrained project scheduling
    Zhang, H
    Li, XD
    Li, H
    Huang, FL
    [J]. AUTOMATION IN CONSTRUCTION, 2005, 14 (03) : 393 - 404
  • [8] A particle swarm optimization for resource-constrained multi-project scheduling problem
    Deng Linyi
    Lin Yan
    [J]. CIS: 2007 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PROCEEDINGS, 2007, : 1010 - 1014
  • [9] A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    Jarboui, B.
    Damak, N.
    Siarry, P.
    Rebai, A.
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2008, 195 (01) : 299 - 308
  • [10] Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
    Chen, Ruey-Maw
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 7102 - 7111