Capital- and resource-constrained project scheduling with net present value optimization

被引:31
|
作者
Leyman, Pieter [1 ]
Vanhoucke, Mario [1 ,2 ,3 ]
机构
[1] Univ Ghent, Fac Econ & Business Adm, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Technol & Operat Management Area, Reep 1, B-9000 Ghent, Belgium
[3] UCL, UCL Sch Management, Gower St, London WC1E 6BT, England
关键词
Project scheduling; Net present value; Capital; Metaheuristics; ONE PROGRAMMING APPROACH; CASH FLOWS; SCATTER SEARCH; PAYMENTS; MAXIMIZE; ALGORITHM; NETWORKS; MODELS;
D O I
10.1016/j.ejor.2016.07.019
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we study the capital-constrained project scheduling problem with discounted cash flows (CCPSPDC) and the capital- and resource-constrained project scheduling problem with discounted cash flows (CRCPSPDC). The objective of both problems is to maximize the project net present value (NPV), based on three cash flow models. Both problems include capital constraints, which force the project to always have a positive cash balance. Hence, it is crucial to schedule activities in such an order that sufficient capital is available. The contribution of this paper is threefold. First, we propose three distinct cash flow models, which affect the capital availability during the project. Second, we introduce two new schedulers to improve capital feasibility, one for the CCPSPDC and one for the CRCPSPDC. The schedulers focus on delaying sets of activities, which cause cash outflows to be received at later time instances, in order to reduce capital shortages. Both schedulers are implemented as part of three metaheuristics from literature, in order to compare the metaheuristics' performance. Two penalty functions have been included, one to improve capital feasibility and another to improve deadline feasibility. Third, the proposed procedure has been tested on a large dataset and the added value of the schedulers has been validated. Managerial insights are provided with respect to the impact of key parameters. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:757 / 776
页数:20
相关论文
共 50 条
  • [21] Financial Optimization of the Resource-Constrained Project Scheduling Problem with Milestones Payments
    Klimek, Marcin
    APPLIED SCIENCES-BASEL, 2021, 11 (02): : 1 - 14
  • [22] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Qiong Jia
    Yoonho Seo
    The International Journal of Advanced Manufacturing Technology, 2013, 67 : 2627 - 2638
  • [23] Hybrid ant colony optimization for the resource-constrained project scheduling problem
    Linyi Deng1
    2. State Key Laboratory of Structural Analysis for Industrial Equipment
    JournalofSystemsEngineeringandElectronics, 2010, 21 (01) : 67 - 71
  • [24] Heuristic Optimization for Robust Resource-Constrained Flexible Project Scheduling Problem
    Liu, Yongli
    Li, Renjie
    Liu, Huiran
    IEEE ACCESS, 2020, 8 : 142269 - 142281
  • [25] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Artigues, Christian
    Leus, Roel
    Nobibon, Fabrice Talla
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 175 - 205
  • [26] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Leus, R.
    Artigues, C.
    Nobibon, F. Talla
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
  • [27] Optimization algorithms for solving resource-constrained project scheduling problem: A review
    Liu, Shi-Xin
    Wang, Meng-Guang
    Tang, Jia-Fu
    Kongzhi yu Juece/Control and Decision, 2001, 16 (SUPPL.): : 647 - 651
  • [28] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [29] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [30] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381