An impact imaging method for monitoring on construction of immersed tube tunnel foundation treated by sand-filling method

被引:11
|
作者
Che, Ailan [1 ]
Zhu, Renjie [1 ]
Fan, Yanmin [1 ]
Feng, Shaokong [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, 800 Dongchuan Rd, Shanghai 200240, Peoples R China
基金
国家重点研发计划;
关键词
Immersed tube tunnel; P-wave impact imaging method (PII); Real-time monitoring; Full scale model test; Sand-filling method; SETTLEMENTS;
D O I
10.1016/j.tust.2018.11.027
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sand filling method (sand-flow method) is widely used in the treatment of immersed tube tunnel foundation, but quick and reliable method for real-time monitoring on the formation of sand-deposit and the connection of sand deposit between neighboring sand filling hole is absent. In this paper, a full-scale model of immersed tube tunnel foundation treated by sand filling method was conducted. The case was simplified as a multi-layered media problem, and a nondestructive testing method based on P-wave was explored to control the sand filling time in different hole. Through model testing, the relationship between the change rate of P-wave response energy and the radius of the sand-deposit is established. Kriging interpolation principle was employed to make a complete evaluation of the sand-deposit. The radius of sand-deposit measured by the P-wave impact imaging method (PII) agree well with the average radius observed by the observation window. Comparing the results of PII in sand filling hole with the relative compactedness of sand foundation after the sand filling, it can be found that the sand foundation boundary detected by PII method agree well with model test result, and the region with higher relative compactedness has a good correspondence with the regions with high change rate of PII. So, the PII method can detect the radius and the distribution of relative compactedness of sand-deposit. Because the method is convenient in calculation, the construction of sand filling foundation can be monitored in real time by PII method. In conclusion, the method can be used to monitor sand-filling treatment in immersed tube tunnel on real-time, and provide a scientific basis for the design and construction of immersed tube tunnel Engineering.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [21] Study on tunnel monitoring method and its application to informational construction
    Zhang, ZG
    Qiao, CS
    Nei, L
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 1422 - 1427
  • [23] SUBAQUEOUS CROSSINGS BY THE IMMERSED TUBE METHOD: NORTH AMERICAN HISTORY AND CONSTRUCTION METHODOLOGY.
    Kelley, Martin N.
    1986, 1 (3-4): : 297 - 302
  • [24] Impact of Double-O-Tube Shield Tunnel Construction on Grillage Beams Foundation Frame Building
    Wei, Xinjiang
    Hong, Jie
    Wei, Gang
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 32 - +
  • [25] Application of CSAMT monitoring method and observational construction management to mountain tunnel
    Fukui, T
    Hirai, T
    Morioka, T
    Suga, A
    Matsui, T
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 219 - 224
  • [26] DYNAMIC CONSTRUCTION CONTROL METHOD FOR A DEEP FOUNDATION PIT WITH SAND-PEBBLE GEOLOGY
    Cheng, Xuansheng
    Luo, Bingbing
    Liu, Haibo
    Xia, Qingchun
    Chen, Chaobo
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2020, 29 (03): : 293 - 305
  • [27] Development of a construction method for revetment using fly ash and cement treated sand
    Kitahara, S
    Okazaki, M
    Wakayama, Y
    Kobayashi, H
    Tanaka, N
    COASTAL GEOTECHNICAL ENGINEERING IN PRACTICE, VOL 1, 2000, : 641 - 646
  • [28] Monitoring analysis and strengthening method about the tunnel running through bridge pile foundation
    Miao, Feng
    Tang, Dejin
    Chen, Yang
    Electronic Journal of Geotechnical Engineering, 2014, 19 (Z6): : 17489 - 17494
  • [29] 3D Discrete Element Method Modelling of Tunnel Construction Impact on an Adjacent Tunnel
    Lin Wu
    Xiedong Zhang
    Zhihua Zhang
    Weichen Sun
    KSCE Journal of Civil Engineering, 2020, 24 : 657 - 669
  • [30] 3D Discrete Element Method Modelling of Tunnel Construction Impact on an Adjacent Tunnel
    Wu, Lin
    Zhang, Xiedong
    Zhang, Zhihua
    Sun, Weichen
    KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (02) : 657 - 669