共 50 条
- [41] Excavation Field Test and Parameters Optimization of the Transverse Pilot Tunnel with Small Diameter Tube Curtain Construction Method Dongbei Daxue Xuebao/Journal of Northeastern University, 2023, 44 (03): : 432 - 439
- [42] ASSESSMENT OF THE IMPACT OF TUNNEL CONSTRUCTION TECHNOLOGY ON THE ROCKS OF THE CONTOUR ARRAY USING THE FINITE ELEMENT METHOD PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2023, 3 : 426 - 435
- [43] Research on the Measures of Metro Mine Method Tunnel Construction Side-crossing Bridge Pile Foundation in Long Distance Bai, Dongfeng, 1600, Editorial Department of Journal of Railway Engineering Society (38): : 68 - 73
- [44] Monitoring Method of Large Section Bifurcated Small Clear Distance Tunnel during Information Construction Control APPLIED SCIENCES-BASEL, 2023, 13 (06):
- [47] A possible prediction method to determine the top concealed karst cave based on displacement monitoring during tunnel construction Bulletin of Engineering Geology and the Environment, 2019, 78 : 341 - 355
- [48] METHOD OF SCOURING PIT MONITORING FOR OFFSHORE WIND POWER FOUNDATION BASED ON ACOUSTIC REVERSE TIME MIGRATION IMAGING Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2024, 45 (08): : 466 - 476
- [49] Evaluation of the dynamic additional impact about foundation pit construction on the existing adjacent subway station with the PBA method ELECTRONIC JOURNAL OF STRUCTURAL ENGINEERING, 2023, 23 (04): : 31 - 39
- [50] An Improved Wavelet Threshold Denoising Method for Health Monitoring Data: A Case Study of the Hong Kong-Zhuhai-Macao Bridge Immersed Tunnel APPLIED SCIENCES-BASEL, 2022, 12 (13):