An impact imaging method for monitoring on construction of immersed tube tunnel foundation treated by sand-filling method

被引:11
|
作者
Che, Ailan [1 ]
Zhu, Renjie [1 ]
Fan, Yanmin [1 ]
Feng, Shaokong [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Naval Architecture Ocean & Civil Engn, 800 Dongchuan Rd, Shanghai 200240, Peoples R China
基金
国家重点研发计划;
关键词
Immersed tube tunnel; P-wave impact imaging method (PII); Real-time monitoring; Full scale model test; Sand-filling method; SETTLEMENTS;
D O I
10.1016/j.tust.2018.11.027
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sand filling method (sand-flow method) is widely used in the treatment of immersed tube tunnel foundation, but quick and reliable method for real-time monitoring on the formation of sand-deposit and the connection of sand deposit between neighboring sand filling hole is absent. In this paper, a full-scale model of immersed tube tunnel foundation treated by sand filling method was conducted. The case was simplified as a multi-layered media problem, and a nondestructive testing method based on P-wave was explored to control the sand filling time in different hole. Through model testing, the relationship between the change rate of P-wave response energy and the radius of the sand-deposit is established. Kriging interpolation principle was employed to make a complete evaluation of the sand-deposit. The radius of sand-deposit measured by the P-wave impact imaging method (PII) agree well with the average radius observed by the observation window. Comparing the results of PII in sand filling hole with the relative compactedness of sand foundation after the sand filling, it can be found that the sand foundation boundary detected by PII method agree well with model test result, and the region with higher relative compactedness has a good correspondence with the regions with high change rate of PII. So, the PII method can detect the radius and the distribution of relative compactedness of sand-deposit. Because the method is convenient in calculation, the construction of sand filling foundation can be monitored in real time by PII method. In conclusion, the method can be used to monitor sand-filling treatment in immersed tube tunnel on real-time, and provide a scientific basis for the design and construction of immersed tube tunnel Engineering.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [41] Excavation Field Test and Parameters Optimization of the Transverse Pilot Tunnel with Small Diameter Tube Curtain Construction Method
    Zhao W.
    Sun Y.
    Bai Q.
    Xia Y.-P.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2023, 44 (03): : 432 - 439
  • [42] ASSESSMENT OF THE IMPACT OF TUNNEL CONSTRUCTION TECHNOLOGY ON THE ROCKS OF THE CONTOUR ARRAY USING THE FINITE ELEMENT METHOD
    Tsyupa, D. A.
    PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2023, 3 : 426 - 435
  • [43] Research on the Measures of Metro Mine Method Tunnel Construction Side-crossing Bridge Pile Foundation in Long Distance
    地铁矿山法隧道长距离侧穿桥梁桩基措施研究
    Bai, Dongfeng, 1600, Editorial Department of Journal of Railway Engineering Society (38): : 68 - 73
  • [44] Monitoring Method of Large Section Bifurcated Small Clear Distance Tunnel during Information Construction Control
    Wang, Jianxiu
    Cao, Ansheng
    Cui, Tao
    Wu, Zhao
    Li, Zonghai
    Lin, Lihua
    Li, Huboqiang
    Long, Yanxia
    APPLIED SCIENCES-BASEL, 2023, 13 (06):
  • [45] Imaging model and vision measurement method considering refraction effect of flat glass windows in tunnel construction
    Zhang, Haidong
    Huo, Junzhou
    Meng, Zhichao
    Wu, Zhen
    Ma, Yuyang
    OPTICS AND LASERS IN ENGINEERING, 2023, 170
  • [46] A possible prediction method to determine the top concealed karst cave based on displacement monitoring during tunnel construction
    Li, S. C.
    Wu, J.
    Xu, Z. H.
    Zhou, L.
    Zhang, B.
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (01) : 341 - 355
  • [47] A possible prediction method to determine the top concealed karst cave based on displacement monitoring during tunnel construction
    S. C. Li
    J. Wu
    Z. H. Xu
    L. Zhou
    B. Zhang
    Bulletin of Engineering Geology and the Environment, 2019, 78 : 341 - 355
  • [48] METHOD OF SCOURING PIT MONITORING FOR OFFSHORE WIND POWER FOUNDATION BASED ON ACOUSTIC REVERSE TIME MIGRATION IMAGING
    Yang, Kaiduan
    Zhang, Cheng
    Zhang, Ning
    Sun, Huaifeng
    Wang, Xiaolong
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2024, 45 (08): : 466 - 476
  • [49] Evaluation of the dynamic additional impact about foundation pit construction on the existing adjacent subway station with the PBA method
    Wang, Lijun
    Dai, Yongxing
    Chen, Zekun
    Zhang, Huijian
    Liu, Gongning
    ELECTRONIC JOURNAL OF STRUCTURAL ENGINEERING, 2023, 23 (04): : 31 - 39
  • [50] An Improved Wavelet Threshold Denoising Method for Health Monitoring Data: A Case Study of the Hong Kong-Zhuhai-Macao Bridge Immersed Tunnel
    Jiang, Xinghong
    Lang, Qing
    Jing, Qiang
    Wang, Hui
    Chen, Juntao
    Ai, Qing
    APPLIED SCIENCES-BASEL, 2022, 12 (13):