Application of CSAMT monitoring method and observational construction management to mountain tunnel

被引:0
|
作者
Fukui, T [1 ]
Hirai, T [1 ]
Morioka, T [1 ]
Suga, A [1 ]
Matsui, T [1 ]
机构
[1] Osaka Prefecture Govt, Toll Rd Corp, Osaka, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The CSAMT (controlled source audio magneto-telluric) method was applied to estimate the condition of the ground with fracture zones and heavily water-bearing zones for tunneling. The analyzed distributions of porosity and water content by volume resulted in good agreement with the results of actual ground condition through construction. Thus, the applicability of the method was confirmed. For the design of a T-shaped tunnel, three-dimensional finite element analysis was applied using the monitoring data of the ground. The tunnel was constructed by an observational method based on the data measured during construction. As a result, the validity of the design was confirmed by grasping the ground behavior at the intersection of the tunnels.
引用
收藏
页码:219 / 224
页数:6
相关论文
共 50 条
  • [1] Study on application of digital image measurement method to monitoring system for tunnel construction management
    Nishiyama S.
    Ohnishi Y.
    Meiji R.
    Nakai T.
    Zairyo/Journal of the Society of Materials Science, Japan, 2010, 59 (03) : 186 - 191
  • [2] Study on tunnel monitoring method and its application to informational construction
    Zhang, ZG
    Qiao, CS
    Nei, L
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 1422 - 1427
  • [3] Construction monitoring and analysis of low mountain ridge tunnel
    Ouyang, Jian
    Wang, Haijun
    Wu, Luxiang
    Zhang, Kexin
    Xue, Xingwei
    ARCHIVES OF CIVIL ENGINEERING, 2024, 70 (01) : 573 - 587
  • [4] Application of CSAMT to exploring karst in Yuanliang Mountain tunnel along Yuhuai railway line
    Zhang, XC
    Lu, YZ
    Gao, QY
    PROGRESS IN ENVIRONMENTAL AND ENGINEERING GEOPHYSICS, 2004, : 374 - 381
  • [5] Criteria for the selection of construction method at the Ovit Mountain Tunnel (Turkey)
    Ozcelik, Mehmet
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (04) : 1323 - 1328
  • [6] Criteria for the selection of construction method at the Ovit Mountain Tunnel (Turkey)
    Mehmet Ozcelik
    KSCE Journal of Civil Engineering, 2016, 20 : 1323 - 1328
  • [7] On the construction quality of a mountain tunnel
    Meng, Feibiao
    Modern Tunnelling Technology, 2013, 50 (02) : 1 - 6
  • [8] Construction deformation monitoring and application analysis for the neighborhood tunnel
    Sheng, Hao
    Gong, Jian-Wu
    Wang, Xin
    CIVIL ENGINEERING AND URBAN PLANNING IV, 2016, : 433 - 436
  • [9] Development and Application of an Automated Planning System for Mountain Tunnel Construction Projects
    Liu R.-C.
    Hsieh S.-H.
    Wang T.-H.
    Tsai C.-Y.
    Chen C.-H.
    Wei S.-B.
    Hsieh, Shang-Hsien, 1600, Chinese Institute of Civil and Hydraulic Engineering (33): : 669 - 677
  • [10] Application of BIM Technology in the Construction Management of Shield Tunnel
    Zhi, Peng
    Shi, Tianyun
    Wang, Wanqi
    Wang, Huilin
    2018 4TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT (ICIM2018), 2018, : 284 - 289