Application of CSAMT monitoring method and observational construction management to mountain tunnel

被引:0
|
作者
Fukui, T [1 ]
Hirai, T [1 ]
Morioka, T [1 ]
Suga, A [1 ]
Matsui, T [1 ]
机构
[1] Osaka Prefecture Govt, Toll Rd Corp, Osaka, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The CSAMT (controlled source audio magneto-telluric) method was applied to estimate the condition of the ground with fracture zones and heavily water-bearing zones for tunneling. The analyzed distributions of porosity and water content by volume resulted in good agreement with the results of actual ground condition through construction. Thus, the applicability of the method was confirmed. For the design of a T-shaped tunnel, three-dimensional finite element analysis was applied using the monitoring data of the ground. The tunnel was constructed by an observational method based on the data measured during construction. As a result, the validity of the design was confirmed by grasping the ground behavior at the intersection of the tunnels.
引用
收藏
页码:219 / 224
页数:6
相关论文
共 50 条
  • [41] Multiscale BIM Modeling and Adaptive Splicing Method of Mountain Tunnel Structure for Engineering Application
    Li, Xiao-Jun
    Tian, Yin-Xue
    Tang, Li
    Chen, Shu-Wang
    Wang, An-Min
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (02): : 126 - 134
  • [42] Design of Mountain Road Tunnel Safety Monitoring System
    Pan, Weidong
    Gu, Renguo
    Lv, Yonggang
    Sheng, Xiaolong
    APPLIED MATERIALS AND ELECTRONICS ENGINEERING, PTS 1-2, 2012, 378-379 : 241 - +
  • [43] Application of bridge construction monitoring management system based on Internet
    Zhu, R.
    Shi, X. F.
    Li, X. X.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 782 - 788
  • [44] Modern blasting technique in tunnel construction, using the high mountain construction site Albula Tunnel II as an example
    Gregori, Clo
    World of Mining - Surface and Underground, 2019, 71 (03): : 179 - 184
  • [45] Application Research on Construction Management of Urban Underground Utility Tunnel Based on BIM
    Li, Yan
    Yang, Jie
    Shen, Xiaowei
    Ma, Yingying
    2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295
  • [46] The Development and Application of 3D Monitoring Alarm Warning System in Tunnel Construction
    Chen, Lihua
    Liao, Fuquan
    Ye, Ming
    ADVANCES IN CIVIL AND STRUCTURAL ENGINEERING III, PTS 1-4, 2014, 501-504 : 839 - 842
  • [47] Analysis of Microtremor Exploration Application and Construction Monitoring in a Large-Diameter Shield Tunnel
    Wang, Zhe
    Sheng, Jianchao
    Wang, Rui
    Li, Xibin
    Xiao, Yuanjie
    Yi, Zihao
    APPLIED SCIENCES-BASEL, 2023, 13 (01):
  • [48] MULTIVARIATE INFORMATION DYNAMIC MONITORING SYSTEM APPLICATION OF TUNNEL CONSTRUCTION PROCESS MODEL TEST
    Liu, Q.
    Chen, J.
    Wei, L.
    Huang, P.
    Luo, Y.
    Pu, X.
    ARCHIVES OF CIVIL ENGINEERING, 2016, 62 (03) : 117 - 136
  • [49] Multivariate Information Dynamic Monitoring System Application of Tunnel Construction Process Model Test
    Liu Qin
    Chen Jianxun
    Huang Pei
    Pu Xiangbo
    Zhao Yan
    Yuan Xiaoshuai
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (09): : 3519 - 3533
  • [50] Theoretical System for the Safety Risk Assessment of Mountain Tunnel Construction
    Xue Y.
    Dong H.
    Li Y.
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2019, 52 : 84 - 91