A Heuristic Algorithm for Solving Multi-crane Scheduling Problem in Batch Annealing Process

被引:1
|
作者
Xie, Xie [1 ]
Kong, Xiangyu [1 ]
Zheng, Yongyue [2 ]
Wei, Kun [1 ]
机构
[1] Shenyang Univ, Key Lab Mfg Ind & Integrated Automat, Shenyang, Peoples R China
[2] Liaoning Inst standardizat, Shenyang, Peoples R China
基金
中国国家自然科学基金;
关键词
Batch annealing process; Crane scheduling; Heuristic algorithm; Absolute performance analysis;
D O I
10.4028/www.scientific.net/AMM.620.179
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates the scheduling of the multi-crane operations in batch annealing process in an iron and steel enterprise so that the completion time of the last annealed coil (makespan) is minimized. The annealing process of each coil consists of two-stage: heating and cooling. To start heating (cooling) for each coil, a special machine named furnace (cooler) must be loaded on. Once the heating (cooling) is completed, the furnace (cooler) must be unloaded immediately without any delay by crane (job no-wait constraint). The aim of our studied problem is to schedule finite machines (furnaces and coolers) by cranes to process jobs under the consideration for avoiding collision between two adjacent cranes and satisfying job no-wait constraint. For solving the problem, we present a heuristic algorithm combining earliest job requirement and closest crane first. Through the theoretical analysis, we show the absolute performance bound of the proposed heuristic algorithm.
引用
收藏
页码:179 / +
页数:2
相关论文
共 50 条
  • [1] An Efficient Heuristic Algorithm for Solving Crane Scheduling Problem
    Xie, Xie
    Li, Yanping
    Zheng, Yongyue
    Li, Xiaoli
    MATERIALS ENGINEERING AND MECHANICAL AUTOMATION, 2014, 442 : 443 - +
  • [2] Crane Scheduling in Batch Annealing Process
    Xie, Xie
    Tang, Lixin
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 2020 - 2025
  • [3] A scatter search-based framework for solving steel enterprise multi-crane scheduling problem
    Xie, Xie
    Zhou, Li
    Zheng, Yongyue
    Wan, Fucai
    BASIC & CLINICAL PHARMACOLOGY & TOXICOLOGY, 2019, 125 : 166 - 167
  • [4] An Intelligence Scheduling Algorithm for Multi-crane in the Steel Product Warehouse
    Lei Zhao-ming
    Wang Peng-Cheng
    Liao Wen-zhe
    Zhao Fan
    2018 24TH IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND COMPUTING (ICAC' 18), 2018, : 736 - 741
  • [5] Scheduling of a single crane in batch annealing process
    Tang, Lixin
    Xie, Xie
    Liu, Jiyin
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (10) : 2853 - 2865
  • [6] An efficient heuristic algorithm for solving a multi-vessel quay crane scheduling problem in container terminals
    Ding, Yi
    Chen, Xiazhong
    Chen, Kaimin
    INTERNATIONAL JOURNAL OF SHIPPING AND TRANSPORT LOGISTICS, 2023, 16 (3-4) : 454 - 477
  • [7] A genetic algorithm heuristic for solving the quay crane scheduling problem with time windows
    Narges Kaveshgar
    Nathan Huynh
    Maritime Economics & Logistics, 2015, 17 : 515 - 537
  • [8] A genetic algorithm heuristic for solving the quay crane scheduling problem with time windows
    Kaveshgar, Narges
    Huynh, Nathan
    MARITIME ECONOMICS & LOGISTICS, 2015, 17 (04) : 515 - 537
  • [9] Multi-crane scheduling in steel coil warehouse
    Xie, Xie
    Zheng, Yongyue
    Li, Yanping
    EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (06) : 2874 - 2885
  • [10] Heuristics of Scheduling a Single Crane in Batch Annealing Process
    Xie, Xie
    Tang, Lixin
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 2, PROCEEDINGS, 2009, : 891 - 894