A Heuristic Algorithm for Solving Multi-crane Scheduling Problem in Batch Annealing Process

被引:1
|
作者
Xie, Xie [1 ]
Kong, Xiangyu [1 ]
Zheng, Yongyue [2 ]
Wei, Kun [1 ]
机构
[1] Shenyang Univ, Key Lab Mfg Ind & Integrated Automat, Shenyang, Peoples R China
[2] Liaoning Inst standardizat, Shenyang, Peoples R China
基金
中国国家自然科学基金;
关键词
Batch annealing process; Crane scheduling; Heuristic algorithm; Absolute performance analysis;
D O I
10.4028/www.scientific.net/AMM.620.179
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates the scheduling of the multi-crane operations in batch annealing process in an iron and steel enterprise so that the completion time of the last annealed coil (makespan) is minimized. The annealing process of each coil consists of two-stage: heating and cooling. To start heating (cooling) for each coil, a special machine named furnace (cooler) must be loaded on. Once the heating (cooling) is completed, the furnace (cooler) must be unloaded immediately without any delay by crane (job no-wait constraint). The aim of our studied problem is to schedule finite machines (furnaces and coolers) by cranes to process jobs under the consideration for avoiding collision between two adjacent cranes and satisfying job no-wait constraint. For solving the problem, we present a heuristic algorithm combining earliest job requirement and closest crane first. Through the theoretical analysis, we show the absolute performance bound of the proposed heuristic algorithm.
引用
收藏
页码:179 / +
页数:2
相关论文
共 50 条
  • [31] An Estimation of Distribution Algorithm for Solving the Quay Crane Scheduling Problem with Availability Constraints
    Exposito Izquierdo, Christopher
    Melian Batista, Belen
    Marcos Moreno Vega, J.
    ADVANCES IN KNOWLEDGE-BASED AND INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, 2012, 243 : 10 - 19
  • [32] Simulation-based Solution for Multi-crane Dynamic Scheduling in Steelmaking Shop
    Li J.
    Xu A.-J.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2020, 41 (12): : 1699 - 1707
  • [33] A tabu search heuristic for the quay crane scheduling problem
    Marcello Sammarra
    Jean-François Cordeau
    Gilbert Laporte
    M. Flavia Monaco
    Journal of Scheduling, 2007, 10 : 327 - 336
  • [34] A tabu search heuristic for the quay crane scheduling problem
    Sammarra, Marcello
    Cordeau, Jean-Francois
    Laporte, Gilbert
    Monaco, M. Flavia
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 327 - 336
  • [35] Solving the Two-Crane Scheduling Problem in the Pre-Steelmaking Process
    Xie, Xie
    Zheng, Yongyue
    Mu, Tianwei
    Wan, Fucai
    Dong, Hai
    PROCESSES, 2023, 11 (02)
  • [36] Hybrid heuristic algorithm for multi-objective scheduling problem
    Peng Jian'gang
    Liu Mingzhou
    Zhang Xi
    Ling Lin
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2019, 30 (02) : 327 - 342
  • [37] Hybrid heuristic algorithm for multi-objective scheduling problem
    PENG Jian’gang
    LIU Mingzhou
    ZHANG Xi
    LING Lin
    Journal of Systems Engineering and Electronics, 2019, 30 (02) : 327 - 342
  • [38] A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    Erera, Alan L.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 2915 - 2928
  • [39] Digital-twin driven energy-efficient multi-crane scheduling and crane number selection in workshops
    Zhao, Ning
    Fu, Zhuorui
    Sun, Yu
    Pu, Xuening
    Luo, Lei
    JOURNAL OF CLEANER PRODUCTION, 2022, 336