An efficient heuristic algorithm for solving a multi-vessel quay crane scheduling problem in container terminals

被引:1
|
作者
Ding, Yi [1 ]
Chen, Xiazhong [1 ]
Chen, Kaimin [2 ]
机构
[1] Shanghai Maritime Univ, Logist Res Ctr, Shanghai, Peoples R China
[2] South China Univ Technol, Sch Business Adm, Guangzhou 510640, Peoples R China
关键词
container terminal; quay crane scheduling; mixed integer linear programming; particle swarm optimisation; PSO; PARTICLE SWARM OPTIMIZATION; ASSIGNMENT; OPERATIONS;
D O I
10.1504/IJSTL.2023.129925
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
As an important node of a multimodal container transport hub, the container terminal occupies a critical position in the whole process of container transportation and the global supply chain network. With the increasing size of container vessels, improving the handling efficiency of multiple vessels at berth in a given port becomes a complex problem to solve. We formulate a mixed-integer linear programming model to minimise the vessel services time, the total completion and travel times of quay cranes (QCs) among multiple vessels. To solve the proposed model, we develop a particle swarm optimisation (PSO) algorithm incorporated with a tailored initial-solution generation algorithm. Furthermore, a couple of acceleration strategies are designed to improve the solution quality and shorten computation time. The results of numerical experiments on real-life instances validate the proposed model and the efficiency of the proposed algorithm.
引用
收藏
页码:454 / 477
页数:25
相关论文
共 50 条
  • [1] A Multi-Vessel Quay Crane Scheduling Problem
    AlAwar, Kalthoom
    Alawani, Mohamed
    Al Jaberi, Shamma
    [J]. 2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,
  • [2] A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach
    Fu, Yi-Min
    Diabat, Ali
    Tsai, I-Tsung
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (15) : 6959 - 6965
  • [3] Quay crane scheduling in container terminals
    Ng, W. C.
    Mak, K. L.
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (06) : 723 - 737
  • [4] An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports
    Tavakkoli-Moghaddam, R.
    Makui, A.
    Salahi, S.
    Bazzazi, M.
    Taheri, F.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (01) : 241 - 248
  • [5] An efficient genetic algorithm for solving the quay crane scheduling problem
    Kayeshgar, Narges
    Huynh, Nathan
    Rahimian, Saeed Khaleghi
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (18) : 13108 - 13117
  • [6] Optimization model and algorithm for quay crane scheduling in container terminals
    [J]. Qin, J. (qinjin@csu.edu.cn), 1600, Science Press (48):
  • [7] An Efficient Heuristic Algorithm for Solving Crane Scheduling Problem
    Xie, Xie
    Li, Yanping
    Zheng, Yongyue
    Li, Xiaoli
    [J]. MATERIALS ENGINEERING AND MECHANICAL AUTOMATION, 2014, 442 : 443 - +
  • [8] A genetic algorithm for the integrated berth allocation and quay crane scheduling problem in container terminals
    Ren, Jie
    Shang, Xiao Ting
    Cao, Jin Xin
    [J]. PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS, 2016, 43 : 1036 - 1040
  • [9] A genetic algorithm heuristic for solving the quay crane scheduling problem with time windows
    Narges Kaveshgar
    Nathan Huynh
    [J]. Maritime Economics & Logistics, 2015, 17 : 515 - 537
  • [10] Dynamic rolling strategy for multi-vessel quay crane scheduling
    Chang, Daofang
    Fang, Ting
    Fan, Yiqun
    [J]. ADVANCED ENGINEERING INFORMATICS, 2017, 34 : 60 - 69