Adjusting planned lead times when order due dates are missed is an intuitive reaction, but these adjustments can be counterproductive when inherent order lead time instability endangers achievement of logistic targets. In this paper, dynamic models are used to characterize lead time instability in two approaches to work system lead time adjustment. Minimum damping is calculated as a function of lead time adjustment parameters. Industrial data are used to illustrate how the approach provides guidance in selecting production planning and control parameters, with the goal of ensuring stability as a key dynamic foundation for satisfying work system logistic performance targets. (C) 2016 CIRP.
机构:
Purdue Univ, Dept Hort & Landscape Architecture, W Lafayette, IN 47907 USAPurdue Univ, Dept Hort & Landscape Architecture, W Lafayette, IN 47907 USA
Hoagland, Lori
Ximenes, Eduardo
论文数: 0引用数: 0
h-index: 0
机构:
Purdue Univ, Dept Agr & Biol Engn, W Lafayette, IN 47907 USA
Purdue Univ, Renewable Resources Engn Lab, 500 Cent Dr, W Lafayette, IN 47907 USAPurdue Univ, Dept Hort & Landscape Architecture, W Lafayette, IN 47907 USA
Ximenes, Eduardo
Ku, Seockmo
论文数: 0引用数: 0
h-index: 0
机构:
Middle Tennessee State Univ, Fermentat Sci Program, Sch Agribusiness & Agrisci, Coll Basic & Appl Sci, 1301 East Main St, Murfreesboro, TN 37132 USAPurdue Univ, Dept Hort & Landscape Architecture, W Lafayette, IN 47907 USA
Ku, Seockmo
Ladisch, Michael
论文数: 0引用数: 0
h-index: 0
机构:
Purdue Univ, Dept Agr & Biol Engn, W Lafayette, IN 47907 USA
Purdue Univ, Renewable Resources Engn Lab, 500 Cent Dr, W Lafayette, IN 47907 USA
Purdue Univ, Weldon Sch Biomed Engn, W Lafayette, IN USAPurdue Univ, Dept Hort & Landscape Architecture, W Lafayette, IN 47907 USA