BIM pilot project Auenbach viaduct - Innovative design methods in bridge construction

被引:5
|
作者
Hochmuth, Markus [1 ]
Breinig, Werner [2 ]
机构
[1] OBERMEYER Planen Beraten GmbH, Fachbereich BIM Ingn Bau, Hansastr 40, D-80686 Munich, Germany
[2] DEGES Deutsch Einheit Fernstrassenplanungs & Bau, Abt P4 3, Bereich P4, Zimmerstr 54, D-10117 Berlin, Germany
关键词
pilot project; BEP; BIM; BIM execution plan; common data environment; digital construction; 3-D; 4-D; 5-D; bridge; bridge construction;
D O I
10.1002/bate.201600041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Auenbach viaduct was chosen by the German Federal Ministry of Transport and Digital Infrastructure (BMVI) as the first of four pilot projects for the implementation of design and construction processes with the aid of the Building Information Modelling (BIM) method. In the course of the preliminary design phase this project's existing designs were to be subjected to an extended economic feasibility study. The structure leads the Federal Highway B 107 across the Auenbach valley, a service road and several tracks on the Dresden-Werdau railway line. Originally the structure was intended to span the entire valley with a total length of about 273 m. During the overall optimisation of the alignment in position and elevation the structure was separated into two single structures linked by an intermediate embankment. In the frame of the pilot project a coordinated complete model was prepared. The aim was to integrate all the project planning models for engineering structures as well as the models of the specialist planners for traffic facilities, subsoil and environment in accordance with the design status in each case. The results of this service phase were provided to the further BIM processes as an object-based, coordinated 3-D complete model. By means of a model-based time schedule it was then possible to perform a complex analysis of the model data (e.g. quantities, costs, deadlines, collision detection, etc) and carry out optimisations. The objective of the intended continuation of the pilot project is the automated, model-based elaboration of the final design and tender for the structure. With the digitalization of construction the design and implementation process is undergoing a fundamental methodological transformation. From the standpoint of the owner DEGES and the project planner OBERMEYER the effects expected as a result of establishing the BIM method should be investigated, checked and assessed.
引用
收藏
页码:482 / 489
页数:8
相关论文
共 50 条
  • [1] Design and Construction of the Auenbach Bridge, Austria
    Geier, Roman
    STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (02) : 153 - 156
  • [2] Innovative design and erection methods solve construction of Rock Cut Bridge
    Nicholls Engineering, Spokane, United States
    PCI J, 4 (42-55):
  • [3] Innovative design and erection methods solve construction of rock cut bridge
    Nicholls, JJ
    Prussack, C
    PCI JOURNAL, 1997, 42 (04): : 42 - 55
  • [4] Innovative and modern planning methods in bridge construction
    Hochmuth, Markus
    Thi Nguyen
    Haeussler, Marco
    BAUTECHNIK, 2020, 97 (02) : 100 - 106
  • [5] BIM pilot projects Hunte bridge and Grawiede bridge - experiences with the BIM tool in design process
    von Der Haar, Christoph
    Gudat, Alexander
    Thiele, Dietmar
    Goehlmann, Joachim
    BAUTECHNIK, 2022, 99 (08) : 630 - 638
  • [6] The HEITKAMP Rapid Construction Bridge: KBE for innovative bridge abutments in the pilot project of the federal freeway A 3 Stokkumer Straβe
    Balder, Thorsten
    Girmscheid, Michael
    Lehmann, Felix
    Hangen, Hartmut
    BETON- UND STAHLBETONBAU, 2021, 116 (S2) : 66 - 72
  • [7] Implementation of an interoperable process to optimise design and construction phases of a residential building: A BIM Pilot Project
    Ciribini, A. L. C.
    Ventura, S. Mastrolembo
    Paneroni, M.
    AUTOMATION IN CONSTRUCTION, 2016, 71 : 62 - 73
  • [8] PENANG BRIDGE PROJECT - SUPERSTRUCTURE DESIGN AND CONSTRUCTION
    MCCABE, R
    KEE, CF
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1990, 88 : 551 - 570
  • [9] Innovative design/build approach: Ambassador bridge project
    Shah, JB
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1996, 12 (04) : 58 - 61
  • [10] An Empirical study on planning and design collaboration of urban railway construction bridge and culvert project based on BIM
    Wu, Chih-ming
    Chiu, Chui-te
    Lin, Jin-fa
    PROCEEDINGS OF THE 2018 IEEE INTERNATIONAL CONFERENCE ON ADVANCED MANUFACTURING (IEEE ICAM), 2018, : 392 - 395