Quantitative Analysis of Human Error Probability in High-Speed Railway Dispatching Tasks

被引:16
|
作者
Sun, Yanhao [1 ,2 ]
Zhang, Qi [2 ,3 ]
Yuan, Zhiming [2 ,3 ]
Gao, Ying [2 ,3 ]
Ding, Shuxin [2 ,3 ]
机构
[1] China Acad Railway Sci, Postgrad Dept, Beijing 100081, Peoples R China
[2] China Acad Railway Sci Corp Ltd, Signal & Commun Res Inst, Beijing 100081, Peoples R China
[3] Natl Res Ctr Railway Intelligence Transportat Sys, Beijing 100081, Peoples R China
基金
中国国家自然科学基金;
关键词
Cognitive reliability and error analysis method (CREAM); human error probability (HEP); common performance condition (CPC); high-speed railway dispatchers; 2-tuple linguistic term sets; evidential reasoning (ER); multi-attribute group decision-making (MAGDM); HUMAN RELIABILITY-ANALYSIS; EVIDENTIAL REASONING APPROACH; DECISION-MAKING; CREAM MODEL; FUZZY; QUANTIFICATION; METHODOLOGY; ENTROPY;
D O I
10.1109/ACCESS.2020.2981763
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Human error can be regarded as a significant factor contributing to high-speed railway accidents. Cognitive Reliability and Error Analysis Method (CREAM) is well-known approach applied to determine Human Error Probability (HEP). However, shortcomings are still disclosed and weaken the applicability of such approach. These include the lack of sufficient failure data, lack of valid description of Common Performance Condition (CPC) and does not consider the CPCs weights. In addition, Basic CREAM does not provide a method to calculate the concrete HEP. In this paper, a modified CREAM is proposed to assess HEP of high-speed railway dispatchers in dispatching tasks. The core of the modified method is to use 2-tuple linguistic term sets to describe CPCs evaluation, combine weighted CPCs by Evidential Reasoning (ER) approach, and adopt Multi-Attribute Group Decision-Making (MAGDM) method to calculate HEP. To make CPCs weights more accurate, dynamically adjusting weights is adopted in this paper. The rationality and validity of the modified CREAM approach are verified by two axioms and compared other models. Finally this modified CREAM approach is applied to human reliability analysis of high-speed railway dispatchers.
引用
收藏
页码:56253 / 56266
页数:14
相关论文
共 50 条
  • [41] Analysis of coupling between high-speed railway and common speed railway system in transportation corridor
    Zhou, Hongchang
    Li, Haijun
    Chen, Xiaohong
    Zhu, Changfeng
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [42] Gross Error Detectability and Identifiability Analysis in Track Control Network for High-Speed Railway Based on GEJE
    Yan, Guangfeng
    Cen, Minyi
    Li, Yangtenglong
    JOURNAL OF SURVEYING ENGINEERING, 2020, 146 (01)
  • [43] Impact Analysis of High-Speed Railway on Urban Spatial Structure: A Case Study of Shanghai-Nanjing Intercity High-Speed Railway
    Chen, Qianfei
    Tan, Binbin
    Zhao, Bingqian
    Liu, Gehui
    CICTP 2020: TRANSPORTATION EVOLUTION IMPACTING FUTURE MOBILITY, 2020, : 5092 - 5103
  • [44] Comprehensive Evaluation of Operating Speeds for High-Speed Railway: A Case Study of China High-Speed Railway
    Zhang, Jiamin
    Zhang, Jiarui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [45] Effect Probability of Randomness of Soil Parameters on Environmental Vibrations Induced by High-speed Railway
    Cao Y.
    Li D.
    Yang C.
    Tiedao Xuebao/Journal of the China Railway Society, 2022, 44 (09): : 128 - 134
  • [46] Quantitative Risk Assessment Method for the On-board ATP of High-speed Railway
    Shi, Lei
    Zheng, Wei
    Ning, Ningjie
    Wu, Daohua
    3RD INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS 2015), 2015, : 763 - 768
  • [47] Motion Error Analysis of High-speed Parallel Robots
    Zhu, Liangliang
    Gavriushin, Sergey S.
    Zheng, Jingzhong
    Chi, Guannan
    2024 8TH INTERNATIONAL CONFERENCE ON ROBOTICS, CONTROL AND AUTOMATION, ICRCA 2024, 2024, : 68 - 72
  • [48] EXPERIMENT OF HIGH-SPEED RAILWAY SUBGRADE SETTLEMENT PREDICTION ANALYSIS
    Zhang, Guangli
    Tan, Qulin
    Li, Leijuan
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 453 - 458
  • [49] Floristic analysis of a high-speed railway embankment in a Mediterranean landscape
    Filibeck, Goffredo
    Cornelini, Paolo
    Petrella, Paolo
    ACTA BOTANICA CROATICA, 2012, 71 (02) : 229 - 248
  • [50] Dynamic analysis of railway bridge under high-speed trains
    Xia, H
    Zhang, N
    COMPUTERS & STRUCTURES, 2005, 83 (23-24) : 1891 - 1901