Study on framework of construction project management maturity model

被引:0
|
作者
Zhai Fengyong [1 ]
Liu Renhui [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
关键词
construction project management maturity model (CPM3); questionnaire; assessment; improvement;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve 'process maturity' of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.
引用
收藏
页码:1180 / +
页数:2
相关论文
共 50 条
  • [31] Study on a Maturity Model of Project Management Capability for a Large Aircraft Main Manufacturer
    GAO Zhi
    YE Jin-fu
    HU Qi-bo
    International Journal of Plant Engineering and Management, 2014, 19 (01) : 52 - 60
  • [32] MODEL OF MATURITY IN PROJECT MANAGEMENT: A CASE STUDY APPLIED TO OIL AND ENERGY PROJECTS
    Reis Costa, Stella Regina
    Batalha Ramos, Ana Flavia
    SISTEMAS & GESTAO, 2013, 8 (03): : 234 - 243
  • [33] Study on system and structure for construction project management mutually model
    Dan, Wang
    Ying, Sun
    Zhongfu, Li
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 334 - 336
  • [34] Developing a Diamond Framework Model Based on "Integration" of Project Success Measures for Construction Project Management in Yemen
    Al-Kuhail, Muaadh Yahya
    Al-Dafiry, Hamoud Ahmed
    Barakat, Tarek Abdullah
    Al-Ansi, Abdulwahad
    PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 29 (03): : 1787 - 1810
  • [35] Software project management maturity assessment model to assess software project management practices
    Fauzi, Shukor Sanim Bin Mohd
    Ramli, Nuraminah Bt
    ICCSA 2007: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND APPLICATIONS, 2007, : 375 - +
  • [36] A new framework for management of technology: Technology management maturity model
    Wu, WW
    Yu, B
    Wang, JL
    PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 2209 - 2213
  • [37] DEVELOPMENT A MODEL TO QUANTITATIVE ASSESSMENT PROJECT MANAGEMENT MATURITY
    Korovkina, N. L.
    Trushkina, E. P.
    BIZNES INFORMATIKA-BUSINESS INFORMATICS, 2010, 14 (04): : 12 - +
  • [38] Project Management Maturity Model (PMMM) in educational organizations
    Demir, C.
    Kocabas, Ibrahim
    WORLD CONFERENCE ON LEARNING, TEACHING AND ADMINISTRATION PAPERS, 2010, 9
  • [39] Research on Maturity Model of Enterprise NPD Project Management
    Ma, Yue
    Chang, Yu
    Zhu, Hanyu
    Xia, Chunyu
    Chang, Zhichao
    ADVANCES IN EDUCATION AND MANAGEMENT, PT IV, 2011, 211 : 328 - 335
  • [40] Project management maturity model and its appraisal method
    Wang, FL
    Proceedings of the 2005 International Conference on Management Science & Engineering (12th), Vols 1- 3, 2005, : 2323 - 2326