Study on framework of construction project management maturity model

被引:0
|
作者
Zhai Fengyong [1 ]
Liu Renhui [1 ]
机构
[1] Harbin Inst Technol, Sch Management, Harbin 150001, Peoples R China
关键词
construction project management maturity model (CPM3); questionnaire; assessment; improvement;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In recent years, Project Management Maturity Model (PMMM, or PM3) has been attracting more and more attentions in the field of project management, which aims to improve 'process maturity' of a project. However, there are hardly applications or researches of PM3 in construction industries, of which project managements are essential characters. This paper constructs a construction project management maturity model (CPM3) according to the principles of generic PM3 and processes of general construction project. The five maturity levels of CPM3 and the structure of it are presented. Besides these, assessment and improvement methods of construction project management maturity are also discussed. An empirical study based on questionnaires is also processed while assessment analyzing. Implementation of CPM3 and some relevant topics are also discussed.
引用
收藏
页码:1180 / +
页数:2
相关论文
共 50 条
  • [41] Project management process maturity (PM)2 model
    Kwak, YH
    Ibbs, CW
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) : 150 - 155
  • [42] Project management maturity model: Concept, research and applications
    Guan, WH
    Li, ZF
    Liu, XZ
    Toshihiro, I
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2498 - 2502
  • [43] Evaluation Model of Project Management Maturity for Highway Enterprise
    Liu, Chi
    Zhang, Zhenji
    2018 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ECONOMICS SYSTEM AND INDUSTRIAL SECURITY ENGINEERING (IEIS 2018), 2018,
  • [44] An Evolutionary Software Project Management Maturity Model for Mauritius
    Sukhoo, Aneerav
    Barnard, Andries
    Eloff, Mariki M.
    Van Der Poll, John A.
    Interdisciplinary Journal of Information, Knowledge, and Management, 2007, 2 : 99 - 118
  • [45] Project management maturity in construction consulting services: Case of Expo in China
    Li, Yongkui
    Yang, Qing
    Pasian, Beverly
    Zhang, Yan
    FRONTIERS OF ENGINEERING MANAGEMENT, 2020, 7 (03) : 384 - 395
  • [46] ORGANIZATIONAL PROJECT MANAGEMENT MATURITY FROM THE CONSTRUCTION PRACTITIONERS POINT OF VIEW
    Motamedpooya, Sepideh
    Asnaashari, Ehsan
    PROCEEDINGS OF INTERNATIONAL STRUCTURAL ENGINEERING AND CONSTRUCTION: INTERACTION BETWEEN THEORY AND PRACTICE IN CIVIL ENGINEERING AND CONSTRUCTION, 2016, : 417 - 422
  • [47] Project management maturity in construction consulting services: Case of Expo in China
    Yongkui Li
    Qing Yang
    Beverly Pasian
    Yan Zhang
    Frontiers of Engineering Management, 2020, 7 : 384 - 395
  • [48] A Risk Management Maturity Assessment Model for Construction Organisations
    Zou, Patrick X. W.
    Ying, Chan Tsz
    PROCEEDINGS OF CRIOCM 2008 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCES OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2008, : 265 - 269
  • [49] Research on Safety Management Maturity Model of Construction Company
    Zhang, Ming Xuan
    Zhang, Dong Lei
    Gao, Quan Chen
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1367 - 1372
  • [50] Conceptual Framework of Construction Project Management Major Activities
    Kamal, M. F. Mustaffa
    Hassan, F.
    Ismail, Z.
    Affandi, H. Mohd
    PSYCHOLOGY, MANAGEMENT AND SOCIAL SCIENCE, 2013, 15 : 165 - 170