Global Methodology for Electrical Utilities Maintenance Assessment Based on Risk-Informed Decision Making

被引:7
|
作者
Gaha, Mohamed [1 ]
Chabane, Bilal [2 ]
Komljenovic, Dragan [1 ]
Cote, Alain [1 ]
Hebert, Claude [3 ]
Blancke, Olivier [1 ]
Delavari, Atieh [1 ]
Abdul-Nour, Georges [4 ]
机构
[1] IREQ, Hydroquebecs Res Inst, Varennes, PQ J3X 1P7, Canada
[2] Univ Montreal, Dept Math & Stat, Montreal, PQ H2L 2C, Canada
[3] Hydroquebec Trans Energie, Montreal, PQ H2Z 1A4, Canada
[4] Univ Quebec Trois Rivieres UQTR, Dept Genie Ind, Trois Rivieres, PQ G8Z 4M3, Canada
关键词
asset management; complexity; electrical power utilities; maintenance; reliability; resilience; risk-informed decision making; value of lost load; RELIABILITY; IMPACT;
D O I
10.3390/su13169091
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Modern electrical power utilities must deal with the replacement of large portions of their assets as they reach the end of their useful life. Their assets may also become obsolete due to technological changes or due to reaching their capacity limits. Major upgrades are also often necessary due to the need to grow capacity or because of the transition to more efficient and carbon-free power alternatives. Consequently, electrical power utilities are exposed to significant risks and uncertainties that have mostly external origins. In this context, an effective framework should be developed and implemented to maximize value from assets, ensure sustainable operations and deliver adequate customer service. Recent developments show that combining the concepts of asset management and resilience offers strong potential for such a framework-not only for electrical utilities, but for industry, too. Given that the quality and continuity of service are critical factors, the concept of Value of Lost Load (VoLL) is an important indicator for assessing the value of undelivered electrical energy due to planned or unplanned outages. This paper presents a novel approach for integrating the power grid reliability simulator into a holistic framework for asset management and electrical power utility resilience. The proposed approach provides a sound foundation for Risk-Informed Decision Making in asset management. Among other things, it considers asset performance as well as the impact of both current grid topology and customer profiles on grid reliability and VoLL. A case study on a major North American electrical power utility demonstrates the applicability of the proposed methodology in assessing maintenance strategy.
引用
收藏
页数:23
相关论文
共 50 条
  • [21] Methodology development for risk-informed monitoring criteria in the maintenance rule
    Shen, Y
    Rozga, GP
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 551 - 558
  • [22] Risk-informed decision-making in the presence of epistemic uncertainty
    Dubois, Didier
    Guyonnet, Dominique
    [J]. INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2011, 40 (02) : 145 - 167
  • [23] Risk-Informed Decision Making for High-Consequence Outcomes
    Smith, Curtis
    Vedros, Kurt
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION 2010, VOL 11, 2012, : 271 - 276
  • [24] Risk-informed decision making at the Hungarian Nuclear Safety Authority
    Macsuga, G
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 1415 - 1420
  • [25] Extending the application of risk-informed dam safety decision making
    Fiedler, W. R.
    Osmun, D. W.
    [J]. RISK ANALYSIS, DAM SAFETY, DAM SECURITY AND CRITICAL INFRASTRUCTURE MANAGEMENT, 2012, : 81 - 86
  • [26] Risk-informed simulation for sustainable product design decision making
    Enyoghasi, Christian
    Badurdeen, Fazleena
    [J]. SUSTAINABLE MANUFACTURING - HAND IN HAND TO SUSTAINABILITY ON GLOBE, 2020, 43 : 399 - 406
  • [27] Risk-Informed Preventive Maintenance Optimization
    Tutt, Teresa E.
    Singh, Inderjeet
    Popova, Elmira
    Kee, Ernie
    [J]. 2012 PROCEEDINGS - ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2012,
  • [28] Heat Stress Monitoring in Construction for Risk-Informed Decision-Making
    Kim, Yoojun
    Ham, Youngjib
    [J]. CONSTRUCTION RESEARCH CONGRESS 2024: ADVANCED TECHNOLOGIES, AUTOMATION, AND COMPUTER APPLICATIONS IN CONSTRUCTION, 2024, : 70 - 78
  • [29] Towards harmonising risk-informed decision making: the ARAMIS and compass projects
    Kirchsteiger, C
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2002, 15 (03) : 199 - 203
  • [30] Risk-informed decision making of safety investments by using the disproportion factor
    Talarico, Luca
    Reniers, Genserik
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2016, 100 : 117 - 130