共 50 条
- [41] Risk-informed methodology for parts selection and management [J]. Quality and Reliability Engineering International, 15 (04): : 261 - 271
- [42] Probabilistic Contingency Analysis for Risk-Informed Decision Making Processes in Electric Grids [J]. PROCEEDINGS OF THE 14TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2013, 2013, : 743 - 745
- [45] Uncertainty in PRA and its implications for use in risk-informed decision-making [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 2190 - 2195
- [46] 6.5.2 Modeling and Analysis Framework for Risk-Informed Decision Making for FAA NextGen [J]. 1600, John Wiley and Sons Inc (23):
- [47] Risk-Informed Decision Making: More Critical Today Than Ever Before [J]. HEALTH SECURITY, 2020, 18 (03) : 153 - 154
- [49] Application of PRA for risk-informed decision-making on a space station payload [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 1702 - 1707