Risk-Informed Preventive Maintenance Optimization

被引:0
|
作者
Tutt, Teresa E. [1 ]
Singh, Inderjeet [2 ]
Popova, Elmira [3 ]
Kee, Ernie [1 ]
机构
[1] South Texas Project Nucl Operating Co, Risk Management, Wadsworth, TX 44281 USA
[2] Univ Texas Austin, Operat Res & Ind Engn, Austin, TX 78712 USA
[3] Univ Texas Austin, Cockrell Sch Engn, Operat Res & Ind Engn, Austin, TX 78712 USA
关键词
Reliability; Maintenance Optimization; Non Homogeneous Poisson Process;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The risk management group at the South Texas Project Electric Generating Station (STPEGS) has successfully developed a Preventive Maintenance (PM) optimization application based on a new mathematical model developed in collaboration with the University of Texas at Austin. This model uses historical maintenance data from the STPEGS work management database. Robust statistical analysis, coupled with an efficient algorithm generates an optimal PM schedule, based on a Non-Homogenous Poisson Process (NHPP) with a power law failure rate function. In addition, the risk associated with significant plant events triggered by a component failure is appropriately captured in the Corrective Maintenance (CM) cost estimates. The probabilities of such events are modeled via fault tree analysis, and consequences re expressed as monetary costs. The net cost of CM is then modified by a weighted sum of the probability of each event multiplied its monetary cost. The ratio of risk-adjusted CM cost to PM cost is used with the failure rate parameters to calculate the optimum PM frequency that minimizes combined CM and PM costs. The software can evaluate individual components or entire systems of components. Several low-risk ranked systems have been evaluated. In this paper we present the results of these evaluations
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Using risk-informed asset management for feedwater system preventative maintenance optimization
    Kee, E
    Sun, A
    Richards, A
    Liming, J
    Salter, J
    Grantom, R
    [J]. JOURNAL OF NUCLEAR SCIENCE AND TECHNOLOGY, 2004, 41 (03) : 347 - 353
  • [2] Extension of reliability centered maintenance methodology to risk-informed maintenance
    Mulvihill, RJ
    Gulati, R
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1359 - 1364
  • [3] Risk-informed Maintenance for Non-coherent Systems
    Tao, Ye
    Lu, Lixuan
    [J]. 59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2013,
  • [4] Methodology development for risk-informed monitoring criteria in the maintenance rule
    Shen, Y
    Rozga, GP
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 551 - 558
  • [5] Risk-informed optimisation of railway tracks inspection and maintenance procedures
    Podofillini, L
    Zio, E
    Vatn, J
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (01) : 20 - 35
  • [6] Risk-informed decision-making related to the on-line maintenance
    Cepin, Marko
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2011, 241 (04) : 1114 - 1118
  • [7] Project for implementation of Maintenance Rule based on risk-informed safety classification
    Qian, Yong-Bai
    Tong, Jie-Juan
    Zhang, Zuo-Yi
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2007, 28 (05): : 75 - 78
  • [8] Risk-informed decisions for epidemics
    Feng, Shihui
    Hossain, Liaquat
    [J]. JOURNAL OF DECISION SYSTEMS, 2016, 25 : 240 - 247
  • [9] Risk-informed inservice inspection
    Ali, SA
    Bagchi, G
    [J]. NUCLEAR ENGINEERING AND DESIGN, 1998, 181 (1-3) : 221 - 224
  • [10] Risk-informed public participation
    Goble, RL
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 1762 - 1767