IP Start-up Control for 300MW Turbine Unit with Bypass System

被引:1
|
作者
Wang, Weibing [1 ]
Wang, Xudong [2 ]
Liu, Dongju [1 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin 150080, Peoples R China
[2] Harbin Univ Sci & Technol, Coll Elect & Elect Engn, Harbin 150080, Peoples R China
关键词
300MW Turbine Unit; IP Start-up; Bypass Control;
D O I
10.1016/j.proeng.2011.08.1115
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Based on the analysis of characters of 300MW unit IP start-up, an approach with bypass system about turbine control has been explored in this paper. Control model for IP start-up is given. The pre-warm control of IP start-up and the start-up mode switching are discussed in detail. Control logic for main valve, valve exchanging and bypass system are properly designed. The opening curve of IP regulation valve is given. The schedule is successfully applied in the IP start-up of #8 turbine system, Shalingzi power plant, China. The actually operation results shows that the control logic is right and reasonable. It's available for the system requirements. (C) 2010 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of Society for Automobile, Power and Energy Engineering
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Reconstruction of the gland sealing system of a 300MW steam turbine unit
    Xie, DM
    Liu, GL
    Wang, JM
    Yang, J
    ENERGY CONVERSION AND APPLICATION, VOL I AND II, 2001, : 862 - 866
  • [2] Turbine and its control system of full scope simulator for Qinshan 300MW Nuclear Power Unit
    Asia Simulation & Control system, Engineering Corp. Ltd., Zhuhai, China
    Hedongli Gongcheng, 2 (168-174):
  • [3] Analysis of coordination of HP and LP bypass with start-up through IP cylinder for 330 MW steam turbine-generator set
    Hu, Richa
    Shi, Jianliang
    Peng, Furui
    Zhongguo Dianli/Electric Power, 2000, 33 (12): : 1 - 4
  • [4] The optimization of the start-up scheduling for a 320 MW steam turbine
    Ji, Dong-Mei
    Sun, Jia-Qi
    Dui, Yue
    Ren, Jian-Xing
    ENERGY, 2017, 125 : 345 - 355
  • [5] FEATURES OF KHTGZ K-300-240 TURBINE START UP ACCORDING TO STANDARD START UP PROCEDURE FOR A 300 MW 2-BOILER UNIT
    CHERNETSKII, NS
    POLYAKOV, VS
    FOLIN, YA
    POLYAKOV, VA
    GALATSAN, VN
    THERMAL ENGINEERING, 1970, 17 (02) : 16 - +
  • [6] Improving the power unit operation flexibility by the turbine start-up optimization
    Nowak, Grzegorz
    Rusin, Andrzej
    Lukowicz, Henryk
    Tomala, Martyna
    ENERGY, 2020, 198 (198)
  • [7] START-UP PHASE OF THTR 300
    GUTSCH, U
    LEITHNER, D
    BRANDES, S
    OPPENHEI.CL
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1974, 19 (04): : 176 - 178
  • [8] Assessing the flaws in welded seam of header of a 300MW steam turbine generator unit
    Song, Li
    Yang, Shuicheng
    Wei, Fengtao
    ENGINEERING PLASTICITY AND ITS APPLICATIONS FROM NANOSCALE TO MACROSCALE, PTS 1 AND 2, 2007, 340-341 : 1431 - +
  • [9] Boiler feeder water control system for 300MW unit of Zhujiang electric power plant
    Zheng, Jianping
    Gongye Yibiao Yu Zidonghua Zhuangzhi/Industrial Instrumentation & Automation, (02): : 23 - 26
  • [10] EXPERIENCE IN DDC TURBINE START-UP
    HOWARD, JR
    ISA JOURNAL, 1966, 13 (07): : 61 - &