共 50 条
- [1] Reconstruction of the gland sealing system of a 300MW steam turbine unit [J]. ENERGY CONVERSION AND APPLICATION, VOL I AND II, 2001, : 862 - 866
- [2] The optimization of the start-up scheduling for a 320 MW steam turbine [J]. ENERGY, 2017, 125 : 345 - 355
- [7] Assessing the flaws in welded seam of header of a 300MW steam turbine generator unit [J]. ENGINEERING PLASTICITY AND ITS APPLICATIONS FROM NANOSCALE TO MACROSCALE, PTS 1 AND 2, 2007, 340-341 : 1431 - +
- [8] Flow Parameter Changes in Steam Turbine 10 MW during Start-Up and Heating [J]. 36TH MEETING OF DEPARTMENTS OF FLUID MECHANICS AND THERMODYNAMICS, 2017, 1889
- [10] Assessment of 300MW Turbine Generator Stator Insulation [J]. PROCEEDINGS OF 2014 INTERNATIONAL SYMPOSIUM ON ELECTRICAL INSULATING MATERIALS (ISEIM 2014), 2014, : 500 - 502