Improving the power unit operation flexibility by the turbine start-up optimization

被引:16
|
作者
Nowak, Grzegorz [1 ]
Rusin, Andrzej [1 ]
Lukowicz, Henryk [1 ]
Tomala, Martyna [1 ]
机构
[1] Silesian Tech Univ, Dept Power Engn & Turbomachinery, Konarskiego 18, PL-44100 Gliwice, Poland
关键词
Steam turbine; Start-up; Optimization; Thermal stress; STEAM; BOILER; IMPACT; PLANT; SIMULATION; SYSTEM;
D O I
10.1016/j.energy.2020.117303
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper is focused on the optimization of turbine start-up. Thermal and strength analyses are conducted for the HP part rotor using the FEM for boundary conditions varying in time and space. The optimization is carried out using the RSM-GA approach. A sensitivity analysis is also performed for the steam parameters in individual stages of the start-up process. The testing results indicate that maximum stress values in the start-up initial stage are considerably affected not only by the steam-metal temperature difference but also by the temperature distribution in the element. Even if classed within the same category, start-ups differ substantially in the duration of downtimes and, consequently, in the level and distribution of initial temperature. It is therefore recommended that the start-up analysis should be preceded by a simulation of the cooling process. The optimization resulted in new start-up curves that make it possible to run the entire start-up process in less than half of the previous. Two stress maxima are observed during the start-up procedure. If the steam initial temperature is appropriately selected to the temperature of the rotor, the start-up duration is most affected by the rate at which the process is run in the final stage. (C) 2020 The Authors. Published by Elsevier Ltd.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Improving concentrating solar power plant performance by increasing steam turbine flexibility at start-up
    Topel, Monika
    Laumert, Bjorn
    [J]. SOLAR ENERGY, 2018, 165 : 10 - 18
  • [2] Optimization of start-up process for unit plant in electrical power plants
    Han Pu
    Wang Fuqiang
    Dai Yijiang
    [J]. SYSTEMS, ORGANIZATIONS AND MANAGEMENT: PROCEEDINGS OF THE 3RD WORKSHOP OF INTERNATIONAL SOCIETY IN SCIENTIFIC INVENTIONS, 2009, : 113 - 121
  • [3] Optimization of start-up operation for centrifugal chiller
    Okazaki, Hirotaka
    Ono, Hitoi
    Yanai, Noritaka
    [J]. IFAC PAPERSONLINE, 2022, 55 (16): : 332 - 337
  • [4] DESIGN, START-UP, AND OPERATION OF AN OZONE DISINFECTION UNIT
    RAKNESS, KL
    STOVER, EL
    KRENEK, DL
    [J]. JOURNAL WATER POLLUTION CONTROL FEDERATION, 1984, 56 (11): : 1152 - 1159
  • [5] Operation start-up
    Calvaruso, JT
    [J]. HOSPITALS & HEALTH NETWORKS, 1997, 71 (23): : 34 - 35
  • [6] Optimization of the Start-up Time of a Variable Speed Pump-Turbine Unit in Pumping Mode
    Pannatier, Y.
    Kawkabani, B.
    Nicolet, C.
    Schwery, A.
    Simond, J. -J.
    [J]. 2012 XXTH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES (ICEM), 2012, : 2126 - 2132
  • [7] Start-up and operation characteristics of a flame fuel cell unit
    Wang, Yuqing
    Zeng, Hongyu
    Cao, Tianyu
    Shi, Yixiang
    Cai, Ningsheng
    Ye, Xiaofeng
    Wang, Shaorong
    [J]. APPLIED ENERGY, 2016, 178 : 415 - 421
  • [8] Optimization of steam turbine start-up based on nonlinear function
    Dong, Chao
    Wang, Bin
    Sun, Yongjian
    Wang, Xiaohong
    [J]. PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 505 - 510
  • [9] Optimization of start-up scheduling and life assessment for a steam turbine
    Ji Dong-mei
    Sun Jia-qi
    Sun Quan
    Guo Heng-Chao
    Ren Jian-Xing
    Zhu Quan-jun
    [J]. ENERGY, 2018, 160 : 19 - 32
  • [10] The optimization of the start-up scheduling for a 320 MW steam turbine
    Ji, Dong-Mei
    Sun, Jia-Qi
    Dui, Yue
    Ren, Jian-Xing
    [J]. ENERGY, 2017, 125 : 345 - 355