摘要
The research of optimizing method on startup process has been carried on from the point of the power set in this article. In the power set's startup process, a research has been made on the equipments about the stress, which are the key equipments to restrict the speed of the starting process. The boiler drum's and the turbine rotor's theoretical stresses are obtained by a one-dimensional finite element stress field calculation. Taking the difference of the equipments as the optimizing steps, with reducing the starting time as the goal to be aspired, an optimization model of the power plant starting process is built up. With the genetic algorithm, optimized starting curves for the boiler's cold starting have been calculated. These optimized starting curves may serve as guides for operating power sets.
引用
收藏
页码:113 / 121
页数:9
相关论文
共 50 条
  • [1] Start-Up Optimization of Combined Cycle Power Plants: A Field Test in a Commercial Power Plant
    Yoshida, Yasuhiro
    Yoshida, Takuya
    Enomoto, Yuki
    Osaki, Nobuhiro
    Nagahama, Yoshito
    Tsuge, Yoshifumi
    [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2019, 141 (03):
  • [2] Analysis and optimization of the start-up process based on Badaling solar power tower plant
    Yang, Y.
    Wang, Z.
    Xu, E.
    Ma, G.
    An, Q.
    [J]. INTERNATIONAL CONFERENCE ON CONCENTRATING SOLAR POWER AND CHEMICAL ENERGY SYSTEMS, SOLARPACES 2014, 2015, 69 : 1688 - 1695
  • [3] Optimization of the start-up procedure of a combined cycle power plant
    Albanesi, C.
    Bossi, M.
    Magni, L.
    Paderno, J.
    Pretolani, R.
    Kuehl, P.
    Diehl, M.
    [J]. PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1841 - +
  • [4] The Impact of the Power Plant Unit Start-Up Scheme on the Pollution Load
    Dwornicka, Renata
    [J]. TEROTECHNOLOGY, 2014, 874 : 63 - 69
  • [5] Improving the power unit operation flexibility by the turbine start-up optimization
    Nowak, Grzegorz
    Rusin, Andrzej
    Lukowicz, Henryk
    Tomala, Martyna
    [J]. ENERGY, 2020, 198
  • [6] Fuzzy Optimization of Start-Up Operations for Combined Cycle Power Plants
    Bertini, Ilaria
    Pannicelli, Alessandro
    Pizzuti, Stefano
    [J]. SOFT COMPUTING MODELS IN INDUSTRIAL AND ENVIRONMENTAL APPLICATIONS, 2010, 73 : 153 - 160
  • [7] Intelligent Start-Up Schedule Optimization System for a Thermal Power Plant
    Shirakawa, Masakazu
    Arakawa, Masao
    Nakayama, Hirotaka
    [J]. JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2007, 1 (05): : 690 - 705
  • [8] Dynamic simulation and optimization of start-up processes in combined cycle power plants
    Shirakawa, M
    Nakamoto, M
    Hosaka, S
    [J]. JSME INTERNATIONAL JOURNAL SERIES B-FLUIDS AND THERMAL ENGINEERING, 2005, 48 (01) : 122 - 128
  • [9] Plant start-up
    不详
    [J]. NUCLEAR PLANT JOURNAL, 1996, 14 (02) : 6 - 6
  • [10] Analysis of a Static Start-up Control Strategy for Pumped Storage Power Plant Unit
    Wang, Deshun
    Yang, Bo
    Li, Guanjun
    Tao, Yibin
    Sang, Bingyu
    [J]. INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT A, 2012, 24 : 155 - 162