共 50 条
- [31] A multi agent system for monitoring industrial gas turbine start-up sequences PICA 2001: 22ND IEEE POWER ENGINEERING SOCIETY INTERNATIONAL CONFERENCE ON POWER INDUSTRY COMPUTER APPLICATIONS, 2001, : 138 - 140
- [33] Realize the feedback control based on incremental observer in 300MW unit adopting EDPF-NT distributed control system ICIEA 2007: 2ND IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-4, PROCEEDINGS, 2007, : 1009 - +
- [34] The Start-up Characteristics of Pump as Turbine System During Different Valve Openings Kung Cheng Je Wu Li Hsueh Pao/Journal of Engineering Thermophysics, 2023, 44 (12): : 3292 - 3304
- [37] Integrated nonlinear model of 300MW power unit for system dynamic performance studies PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 361 - 366
- [38] Research on the start-up of the +300kvar ASVG Qinghua Daxue Xuebao/Journal of Tsinghua University, 37 (07): : 44 - 47
- [39] Nonlinear boiler model of 300MW power unit for system dynamic performance studies ISIE 2001: IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS PROCEEDINGS, VOLS I-III, 2001, : 1296 - 1300