Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China

被引:28
|
作者
Zhang, Shengxi [1 ]
Li, Zhongfu [1 ]
Ma, Shengbin [1 ]
Li, Long [2 ]
Yuan, Mengqi [1 ,3 ]
机构
[1] Dalian Univ Technol, Dept Construct Management, Dalian 116024, Peoples R China
[2] Qingdao Univ Technol, Sch Management Engn, Qingdao 266000, Peoples R China
[3] City Univ Hong Kong, Dept Architectural & Civil Engn, Hong Kong 999077, Peoples R China
基金
中国国家自然科学基金;
关键词
interface management; prefabricated building; sustainable development; critical factors; factor analysis; OFF-SITE CONSTRUCTION; SUPPLY CHAIN MANAGEMENT; HOUSING PRODUCTION; INDUSTRIALIZED CONSTRUCTION; MARKETING INTERFACE; MODEL; INNOVATION; DESIGN; SYSTEM; BIM;
D O I
10.3390/su14095418
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Recently, interface management has been regarded as the key to the success of prefabricated building projects (PBPs) due to its capabilities to manage numerous interfaces caused by PBPs' inherent geographical and organizational fragmentation. However, the factors influencing the interface management of PBPs are largely unknown and poorly studied. To compensate for this gap, this study aimed to investigate the critical factors influencing interface management in PBPs with quantitative and qualitative methods. Twenty-seven critical factors influencing the interface management of PBPs were identified through a literature review, questionnaire survey, and face-to-face interviews with professionals in the construction industry. A questionnaire survey was sent out to developers, designers, manufacturers, contractors, and consultants in China, and 66 completed questionnaires were received. Results showed the top five critical factors influencing the interface management of PBPs were (1) accuracy of design, (2) timeliness of information communication, (3) timeliness of component production and supply, (4) standardization of design, and (5) definition of work content and scope. The 27 influencing factors of PBPs were further categorized into seven groups via exploratory factor analysis, namely: (1) information communication, (2) trust and cooperation, (3) technical and management capability, (4) organizational integration, (5) standardization, (6) technical environment, and (7) contractual management. Improving these issues will contribute to the successful implementation of PBPs. Finally, combined with relevant literature and expert interviews, the impact of these seven clusters on the interface management of PBPs was discussed. The findings may contribute to deepening the understanding of interface management, reducing unnecessary conflicts and difficulties, and promoting the sustainable development of prefabricated building (PB).
引用
收藏
页数:20
相关论文
共 50 条
  • [31] Factors Influencing Early Termination of PPP Projects in China
    Song, Jinbo
    Hu, Yibo
    Feng, Zhuo
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (01)
  • [32] Risk factors influencing the building projects in Pakistan: from perspective of contractors, clients and consultants
    Kamal, Asad
    Abas, Muhammad
    Khan, Dildar
    Azfar, Rai Waqas
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 1141 - 1157
  • [33] Critical cost factors of building construction projects in Malaysia
    Toh, Tien-Choon
    Ting, Connie
    Ali, Kherun-Nita
    Aliagha, Godwin-Uche
    Munir, Omar
    INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT, 2012, 57 : 360 - 367
  • [34] Exploring Critical Risk Factors of Office Building Projects
    Phong Thanh Nguyen
    Cuong Phu Pham
    Phuong Thanh Phan
    Ngoc Bich Vu
    My Tien Ha Duong
    Quyen Le Hoang Thuy To Nguyen
    JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2021, 8 (02): : 309 - 315
  • [35] A BIM-Based Study on the Comprehensive Benefit Analysis for Prefabricated Building Projects in China
    Ji, Yingbo
    Chang, Siwei
    Qi, Yuan
    Li, Yan
    Li, Hong Xian
    Qi, Kai
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [36] Identifying the Critical Factors Affecting the Operational Performance of Characteristic Healthcare Town PPP Projects: Evidence from China
    Pan, Haize
    Pan, Yongwei
    Liu, Xing
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2023, 29 (04)
  • [37] Factors Influencing Transaction Costs in Construction Projects: A Critical Review
    Jin, Xiao-Hua
    Zhang, Guomin
    Ke, Yongjian
    Xia, Bo
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 949 - 958
  • [38] CRITICAL FACTORS INFLUENCING INVENTORY AND PROCUREMENT SYSTEM OF INFRASTRUCTURE PROJECTS
    Al-Aidrous, Al Hussein Mohammed Hassan
    Hern, Ng Jenn
    Rahmawati, Yani
    Jahja, Mohamad
    Yusof, Khamaruzaman Wan
    Zawawi, Noor Amila Wan Abdullah
    Utomo, Christiono
    Raflis
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (08) : 634 - 645
  • [39] Critical Factors Influencing the Performance of Highway Projects: An Empirical Evaluation
    Deep, Shumank
    Banerjee, Shankar
    Dixit, Saurav
    Vatin, Nikolai Ivanovich
    BUILDINGS, 2022, 12 (06)
  • [40] Factors influencing BIM use in green building construction project management in the UK and China
    Tian, Ling
    Wright, Andrew
    Painter, Birgit
    Pazhoohesh, Mehdi
    BUILDING RESEARCH AND INFORMATION, 2023, 51 (07): : 853 - 870