CRITICAL FACTORS INFLUENCING INVENTORY AND PROCUREMENT SYSTEM OF INFRASTRUCTURE PROJECTS

被引:3
|
作者
Al-Aidrous, Al Hussein Mohammed Hassan [1 ]
Hern, Ng Jenn [1 ]
Rahmawati, Yani [2 ]
Jahja, Mohamad [3 ]
Yusof, Khamaruzaman Wan [1 ]
Zawawi, Noor Amila Wan Abdullah [1 ]
Utomo, Christiono [4 ]
Raflis [5 ]
机构
[1] Univ Teknol PETRONAS, Dept Civil & Environm Engn, Bandar Seri Iskandar, Perak, Malaysia
[2] Univ Gadjah Mada, Dept Architecture & Planning, Yogyakarta, Indonesia
[3] Univ Negeri Gorontalo, Dept Phys, Gorontalo, Indonesia
[4] Inst Teknol Sepuluh Nopember, Dept Civil Engn, Surabaya, Indonesia
[5] Univ Trisakti, Dept Civil Engn, Jakarta, Indonesia
关键词
inventory management; procurement management; logistics; planning; project operation and management; supply chain material; BIM IMPLEMENTATION; CONSTRUCTION; MANAGEMENT; LOGISTICS;
D O I
10.3846/jcem.2022.16681
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The performance of any construction project is highly influenced by the efficient planning of materials among construction supply chain players. The improper planning for the construction project has been discussed recently in the literature, with a special focus on the logistic and material aspects. Completing a construction project within time and cost constraints is highly affected by the inventory management system. Such evidence proves the big impact of the inventory management system on construction performance. Derived from these arguments, the critical impact of the inventory and procurement system used at the construction site is definite. This research aims to examine the main factors that need to be considered when developing an inventory and procurement management system and classify the most influential and impactful factors. This research adopted a two-steps methodology, which started with an interview with construction experts then followed by a questionnaire survey targeting project managers and engineers from MRT Line 2 Tunneling infrastructure project in Malaysia. Exploratory Factor Analysis (EFA) was used for data analysis as well as the scatter plot of the mean and standard deviation analysis. The most critical factors affecting the inventory and procurement handling are related to the operation and management aspects. The top five impactful factors are communication between labor and management, information sharing, software usage on material tracking, purchasing plan, and construction progress. The research outcomes can be used to develop further mitigation plans in the early stages of infrastructure projects.
引用
收藏
页码:634 / 645
页数:12
相关论文
共 50 条
  • [1] Factors Influencing Procurement Adoption in Construction: Building vs Infrastructure Projects
    Sethuraman, Vithyashini
    Perera, B. A. K. S.
    Sumanarathna, D. M. G. A. N. M.
    [J]. 2ND INTERNATIONAL MERCON 2016 MORATUWA ENGINEERING RESEARCH CONFERENCE, 2016, : 277 - 282
  • [2] Critical Success Factors in Infrastructure Projects
    Zakaria, Siti Fairus
    Zin, Rosli Mohamad
    Mohamad, Ismail
    Balubaid, Saeed
    Mydin, Shaik Hussein
    Rahim, E. M. Roodienyanto Mohd
    [J]. 3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903
  • [3] Critical success factors of infrastructure construction projects
    Yamany, Mohamed S.
    Abdelhameed, Abdelnaser
    Elbeltagi, Emad
    Mohamed, Hany Abd Elshakour
    [J]. INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (04)
  • [4] Critical success factors of infrastructure construction projects
    Mohamed S. Yamany
    Abdelnaser Abdelhameed
    Emad Elbeltagi
    Hany Abd Elshakour Mohamed
    [J]. Innovative Infrastructure Solutions, 2024, 9
  • [5] Procurement and Governance Choices for Collaborative Infrastructure Projects
    Chen, Le
    Manley, Karen
    Lewis, Joanne
    Helfer, Fernanda
    Widen, Kristian
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (08)
  • [6] RISK FACTORS INFLUENCING INTERNATIONALLY FUNDED PUBLIC INFRASTRUCTURE PROJECTS IN THAILAND
    Ayudhya, Borvorn Israngkura Na
    [J]. SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2012, 19 (03): : 189 - 201
  • [7] Public-private partnerships: critical factors for procurement of capital projects
    Amponsah, Christian Tabi
    Forbes, Judith L.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2012, 165 (04) : 211 - 221
  • [8] Public-private partnerships: Critical factors for procurement of capital projects
    Amponsah, Christian Tabi
    Forbes, Judith L.
    [J]. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 2012, 165 (04): : 211 - 221
  • [9] Cost-influencing risk factors in infrastructure projects on soft soils
    Low, Wai Wah
    Wong, Kwong Soon
    Lee, Jun Liang
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 229 - 241
  • [10] Public-private partnerships: Critical factors for procurement of capital projects
    Amponsah, Christian Tabi
    Forbes, Judith L.
    [J]. Proceedings of the Institution of Civil Engineers: Civil Engineering, 2012, 165 (04) : 211 - 221