Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China

被引:28
|
作者
Zhang, Shengxi [1 ]
Li, Zhongfu [1 ]
Ma, Shengbin [1 ]
Li, Long [2 ]
Yuan, Mengqi [1 ,3 ]
机构
[1] Dalian Univ Technol, Dept Construct Management, Dalian 116024, Peoples R China
[2] Qingdao Univ Technol, Sch Management Engn, Qingdao 266000, Peoples R China
[3] City Univ Hong Kong, Dept Architectural & Civil Engn, Hong Kong 999077, Peoples R China
基金
中国国家自然科学基金;
关键词
interface management; prefabricated building; sustainable development; critical factors; factor analysis; OFF-SITE CONSTRUCTION; SUPPLY CHAIN MANAGEMENT; HOUSING PRODUCTION; INDUSTRIALIZED CONSTRUCTION; MARKETING INTERFACE; MODEL; INNOVATION; DESIGN; SYSTEM; BIM;
D O I
10.3390/su14095418
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Recently, interface management has been regarded as the key to the success of prefabricated building projects (PBPs) due to its capabilities to manage numerous interfaces caused by PBPs' inherent geographical and organizational fragmentation. However, the factors influencing the interface management of PBPs are largely unknown and poorly studied. To compensate for this gap, this study aimed to investigate the critical factors influencing interface management in PBPs with quantitative and qualitative methods. Twenty-seven critical factors influencing the interface management of PBPs were identified through a literature review, questionnaire survey, and face-to-face interviews with professionals in the construction industry. A questionnaire survey was sent out to developers, designers, manufacturers, contractors, and consultants in China, and 66 completed questionnaires were received. Results showed the top five critical factors influencing the interface management of PBPs were (1) accuracy of design, (2) timeliness of information communication, (3) timeliness of component production and supply, (4) standardization of design, and (5) definition of work content and scope. The 27 influencing factors of PBPs were further categorized into seven groups via exploratory factor analysis, namely: (1) information communication, (2) trust and cooperation, (3) technical and management capability, (4) organizational integration, (5) standardization, (6) technical environment, and (7) contractual management. Improving these issues will contribute to the successful implementation of PBPs. Finally, combined with relevant literature and expert interviews, the impact of these seven clusters on the interface management of PBPs was discussed. The findings may contribute to deepening the understanding of interface management, reducing unnecessary conflicts and difficulties, and promoting the sustainable development of prefabricated building (PB).
引用
收藏
页数:20
相关论文
共 50 条
  • [11] Critical Factors Affecting the Promotion of Emerging Information Technology in Prefabricated Building Projects: A Hybrid Evaluation Model
    Luan, Haiying
    Li, Long
    Jiang, Peng
    Zhou, Jian
    BUILDINGS, 2022, 12 (10)
  • [12] Factors Influencing Stakeholder Management in Building Projects Procured by Private Corporate Organisations
    Olatunde N.A.
    Odeyinka H.A.
    Journal of Engineering, Project, and Production Management, 2021, 11 (01): : 9 - 18
  • [13] Exploring the Impact Mechanism of Interface Management of Prefabricated Construction Projects
    Zhang, Shengxi
    Yuan, Mengqi
    Li, Long
    SUSTAINABILITY, 2022, 14 (21)
  • [14] Supply Chain Management for Prefabricated Building Projects in Hong Kong
    Luo, Lizi
    Jin, Xin
    Shen, Geoffrey Qiping
    Wang, Yingjie
    Liang, Xin
    Li, Xiao
    Li, Clyde Zhengdao
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (02)
  • [15] Strength and Influencing Factors of Sleeve Grouting Materials in Prefabricated Building
    Xiong Y.
    Li J.
    Sun B.
    Mao S.
    Jianzhu Cailiao Xuebao/Journal of Building Materials, 2019, 22 (02): : 272 - 277
  • [16] Critical factors for waste management in office building retrofit projects in Australia
    Li, Mei
    Yang, Jay
    RESOURCES CONSERVATION AND RECYCLING, 2014, 93 : 85 - 98
  • [17] Influencing factors on inter-organizational trust asymmetry behavior in construction projects Evidence from China
    Li, Yijing
    He, Nan
    Li, Huimin
    Liu, Ziqi
    Qi, Jianyun
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 308 - 331
  • [18] Exploring critical success factors for waste management in construction projects of China
    Lu, Weisheng
    Yuan, Hongping
    RESOURCES CONSERVATION AND RECYCLING, 2010, 55 (02) : 201 - 208
  • [19] Factors influencing school building construction projects abandonment
    Damoah, Isaac Sakyi
    Tingbani, Ishmael
    Kumi, Desmond Kwadjo
    Akwei, Cyntia C.
    Amoako, Isaac Oduro
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (06) : 961 - 976
  • [20] Factors influencing the spread of green building projects in the UAE
    Yas, Zinah
    Jaafer, Kamal
    JOURNAL OF BUILDING ENGINEERING, 2020, 27