Compaction grouting for sinkhole repair at WAC Bennett dam

被引:0
|
作者
Warner, J
Jefferies, M
Garner, S
机构
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
WAC Bennett dam is a zoned earth embankment slightly greater than 600 ft (183 m) in height. Two sinkholes, of which the deepest descended about 400 ft (120 m) from the crest, were discovered in the core of the dam in 1996. Compaction Grouting was chosen as the best remedial method, and was used. Because even the slightest chance of hydraulic fracturing of the core could not be tolerated, grouting was carefully designed and controlled including: precision drilling of the deep holes to within a verticality tolerance of one degree; continuous analytical evaluation of the grouting based on real time computer monitoring; careful control of the grout mix and especially its aggregate component; and, rigid control of the grout injection rate. The dam core was also monitored during grouting using a broad range of instrumentation, both on and within the embankment. Procedures were verified by a full-scale test before working on the dam.
引用
收藏
页码:869 / 880
页数:12
相关论文
共 50 条
  • [41] Using the Grouting Intensity Number (GIN) to assess Compaction Grouting performance
    Perkins, SW
    Harris, J
    GROUTING AND GROUND TREATMENT, VOL 2, PROCEEDINGS, 2003, (120): : 991 - 1009
  • [42] Permeation grouting for remediation of dam cores
    Park, DongSoon
    Oh, Jeheon
    ENGINEERING GEOLOGY, 2018, 233 : 63 - 75
  • [43] Crack grouting of a model masonry dam
    Shroff, AV
    Joshi, NH
    SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 1: ELEVENTH ASIAN REGIONAL CONFERENCE, 1999, : 347 - 350
  • [44] TEST EMBANKMENT DAM OF FRACTURE GROUTING
    CHEN, YJ
    ZHANG, SI
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1989, 115 (11): : 1668 - 1672
  • [45] A Moorland dam: remedial grouting works
    Rigby T.
    Dams and Reservoirs, 2024, 34 (02) : 77 - 85
  • [46] Application of splitting grouting on the dam reinforcement
    Wu, Ke
    Bai, Yongnian
    Li, Shucai
    GEOTECHNICAL ENGINEERING FOR DISASTER MITIGATION AND REHABILITATION, 2008, : 755 - +
  • [47] GROUTING AT AN EARTHFILL DAM PROJECT.
    Samuel, Hugh R.
    Concrete (London), 1979, 13 (04): : 20 - 26
  • [48] Limited mobility displacement grouting: When "compaction grout" is not compaction grout
    Byle, MJ
    GROUTING: COMPACTION, REMEDIATION AND TESTING, 1997, (66): : 32 - 42
  • [49] Enhancement of compaction grouting on a compaction-grouted soil nail in sand
    Ye, Xin-Yu
    Peng, Rui
    Ma, Xin-Yan
    Zhang, Sheng
    Wang, Shan-Yong
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2021, 43 (09): : 1649 - 1656
  • [50] A study of the grouting at the bottom of the Yashio dam reservoir and the evaluation of the leakage by grouting
    Kawashima, F.
    Kimura, Y.
    DAMS AND RESERVOIRS UNDER CHANGING CHALLENGES, 2011, : 219 - 227