共 50 条
- [1] Grouting design for slope stability of kedung uling earthfill dam [J]. THE THIRD INTERNATIONAL CONFERENCE ON SUSTAINABLE INFRASTRUCTURE AND BUILT ENVIRONMENT (SIBE 2017), 2018, 147
- [3] Replacement of a deteriorated earthfill dam with an RCC gravity dam - The Penn forest dam replacement project [J]. DEALING WITH AGING DAMS, 1999, : 359 - 373
- [4] GROUTING HEAD RACE TUNNEL OF THE LOKTAK PROJECT. [J]. Indian Concrete Journal, 1985, 59 (12): : 328 - 333
- [5] REINSTRUMENTATION OF AN EARTHFILL DAM [J]. CANADIAN GEOTECHNICAL JOURNAL, 1993, 30 (02) : 193 - 210
- [6] Computer Control of Dam Installations for the Talghan Project. [J]. Siemens-Zeitschrift, 1975, 49 (03): : 129 - 133
- [8] Analytical Prediction of Stability of Earthfill Dam [J]. PROCEEDINGS OF THE 8TH RUSSIAN-CHINESE SYMPOSIUM COAL IN THE 21ST CENTURY: MINING, PROCESSING, SAFETY, 2016, 92 : 188 - 192
- [9] Simulation of Breach Outflow for Earthfill Dam [J]. 4TH INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT 2013 (ICEE 2013), 2013, 16
- [10] DESIGN AND CONSTRUCTION OF REVELSTOKE EARTHFILL DAM [J]. CANADIAN GEOTECHNICAL JOURNAL, 1983, 20 (03) : 416 - 427