A study of the grouting at the bottom of the Yashio dam reservoir and the evaluation of the leakage by grouting

被引:0
|
作者
Kawashima, F. [1 ]
Kimura, Y. [1 ]
机构
[1] Tokyo Elect Power Co Ltd, Tokyo, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the Yashio dam reservoir, there is a network of fissures which assumed open fissures of the high dip angle that has the hydrothermal alternation and a large-scale bedrock creep regarded as the main generation factor of the subject in deeper areas. As a result of the test grouting which we performed before the construction for leakage stoppage, we utilized an injection pressure and a limit sedimentation velocity of cement particles and performed effective grouting for fissures of the big width at the bedrock of the bottom of the reservoir filled with water. Further, we confirmed that the leak had been reduced. In this article, we have conducted a qualitative consideration of the grouting mechanism.
引用
收藏
页码:219 / 227
页数:9
相关论文
共 50 条
  • [1] Remediation of leakage of an earth-filled dam and reservoir by geophysically-directed grouting, Washington, Missouri
    Taylor, DG
    Lange, AL
    HYDROGEOLOGY AND ENGINEERING GEOLOGY OF SINKHOLES AND KARST - 1999, 1999, : 253 - 259
  • [2] GROUTING A SAND DAM
    SILVER, ML
    FISK, PS
    GREENMAN, AL
    CIVIL ENGINEERING, 1986, 56 (12): : 34 - 36
  • [3] Evaluation of seepage field of grouting curtain in Danjiangkou dam
    Yang, Guangzhong
    Peng, Hanxing
    Ma, Xiaohui
    Zhou, Lili
    Xu, Junyang
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2000, (04): : 33 - 39
  • [4] The Detection and Analysis of Reservoir Dam Crack Depth and Grouting Quality Analysis
    Zhang, Jinyang
    Gao, Xiu
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 3329 - 3332
  • [5] Grouting Applications in Cindere Dam
    Alkaya, Devrim
    Yesil, Burak
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2011, 17 (01): : 9 - 18
  • [6] GROUTING REHABS EARTH DAM
    BAKER, WH
    GAZAWAY, HN
    KAUTZMANN, G
    CIVIL ENGINEERING, 1984, 54 (09): : 49 - 52
  • [7] MICROS STEP INTO DAM GROUTING
    不详
    ENGINEERING NEWS-RECORD, 1983, 211 (24): : 31 - 31
  • [8] Grouting measures in dam construction
    Kogler K.
    Hechenbichler J.
    Gabriel P.
    Geomechanik und Tunnelbau, 2019, 12 (02): : 129 - 140
  • [9] Grouting of the Leibis/Lichte dam
    Kühnel, Markus
    Aberle, Bernd
    WasserWirtschaft, 2007, 97 (06) : 20 - 24
  • [10] Dworshak Dam foundation grouting
    Wright, EL
    ASSOCIATION OF STATE DAM SAFETY OFFICIALS 1998 ANNUAL CONFERENCE PROCEEDINGS, 1998, : 267 - 276