Grouting of the Leibis/Lichte dam

被引:0
|
作者
Kühnel, Markus [1 ]
Aberle, Bernd [2 ]
机构
[1] Hydroprojekt Ingenieurgesellschaft mbH, Rießnerstr. 18, Weimar,99427, Germany
[2] Einzinger Landstraße 147, Niederröblingen,06542, Germany
关键词
Potable water;
D O I
10.1007/BF03241408
中图分类号
学科分类号
摘要
引用
下载
收藏
页码:20 / 24
相关论文
共 50 条
  • [1] Does Leibis/Lichte Dam Management Meet High Ecological Demands?
    Geisen, Stefan
    Mauden, Roland
    Scheibke, Rainer
    WASSERWIRTSCHAFT, 2016, 106 (06) : 78 - 81
  • [2] Leibis/Lichte: Germany's last large drinking water dam
    Peters, J.
    Klaußer, V.
    Kraft, H.
    Willmitzer, H.
    International Journal on Hydropower and Dams, 2001, 8 (04): : 76 - 81
  • [3] Dam Leibis/Lichte between block construction and RCC - Tradition contra modernity
    Heiland, Michael
    Schaarschmidt, Lars
    Roos, Thomas
    WasserWirtschaft, 2007, 97 (10) : 13 - 15
  • [4] The completion von the Dam Leibis/Lichte: The Use of natural Processes and of Engineering Potentials for the Supply of high value Drinking Water
    Willmitzer, Hartmut
    WASSERWIRTSCHAFT, 2014, 104 (1-2) : 42 - 45
  • [5] GROUTING A SAND DAM
    SILVER, ML
    FISK, PS
    GREENMAN, AL
    CIVIL ENGINEERING, 1986, 56 (12): : 34 - 36
  • [6] Grouting Applications in Cindere Dam
    Alkaya, Devrim
    Yesil, Burak
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2011, 17 (01): : 9 - 18
  • [7] GROUTING REHABS EARTH DAM
    BAKER, WH
    GAZAWAY, HN
    KAUTZMANN, G
    CIVIL ENGINEERING, 1984, 54 (09): : 49 - 52
  • [8] MICROS STEP INTO DAM GROUTING
    不详
    ENGINEERING NEWS-RECORD, 1983, 211 (24): : 31 - 31
  • [9] Grouting measures in dam construction
    Kogler K.
    Hechenbichler J.
    Gabriel P.
    Geomechanik und Tunnelbau, 2019, 12 (02): : 129 - 140
  • [10] Dworshak Dam foundation grouting
    Wright, EL
    ASSOCIATION OF STATE DAM SAFETY OFFICIALS 1998 ANNUAL CONFERENCE PROCEEDINGS, 1998, : 267 - 276