Parallel chance-constrained dynamic programming for cascade hydropower system operation

被引:35
|
作者
Liu, Benxi [1 ,2 ,3 ]
Cheng, Chuntian [1 ,3 ]
Wang, Sen [4 ]
Liao, Shengli [1 ,3 ]
Chau, Kwok-Wing [5 ]
Wu, Xinyu [1 ,3 ]
Li, Weidong [6 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Elect Engn Postdoctoral Stn, Dalian 116024, Peoples R China
[3] Dalian Univ Technol, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat, Dalian 116024, Peoples R China
[4] Pearl River Hydraul Res Inst, Guangzhou 510611, Guangdong, Peoples R China
[5] Hong Kong Polytech Univ, Dept Civil & Environm Engn, Hong Kong, Hong Kong, Peoples R China
[6] Dalian Univ Technol, Sch Elect Engn, Dalian 116024, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Chance-constrained dynamic programming; Parallel programming; Reliability; Extreme system failure; Cascade hydropower system; PARTICLE SWARM OPTIMIZATION; UNIT COMMITMENT; ENERGY SYSTEM; MODEL; DESIGN; GENERATION; RESERVOIRS; FUZZY; RULES; SIMULATION;
D O I
10.1016/j.energy.2018.09.140
中图分类号
O414.1 [热力学];
学科分类号
摘要
With continuing development of hydropower in China, cascade hydropower system will account for more in the power grid, and may increase power grid operation risk under global climate change. This paper presents a parallel chance-constrained dynamic programming model to derive optimal operating policies for a cascade hydropower system in China. The innovation work of this paper is mainly embodied in two aspects. First, the reliabilities of meeting the firm power requirements of the cascade hydropower system and avoiding extreme system failure under extreme events are explicitly embedded in the model using Lagrangian duality theory and a penalty function. Multiple operating policies are generated by updating the values of Lagrangian multiplier and penalty coefficient for system disruption, then best operating rules are selected based on system performance and evaluated according to simulated reliability, extreme system failure, and maximum benefit. Second, the Fork/Join parallel framework is deployed to parallelize the chance-constrained dynamic programming in a multi-core environment for improving computational efficiency. Two computing platforms with contrasting configurations are employed to illustrate the parallelization performance. Results from a cascade hydropower system operation demonstrate that the proposed method is computationally efficient and can obtain satisfying operating policies, especially for extreme drought events. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:752 / 767
页数:16
相关论文
共 50 条
  • [41] CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING AND OPTIMIZATION OF WATER-RESOURCE SYSTEMS
    ASKEW, AJ
    WATER RESOURCES RESEARCH, 1974, 10 (06) : 1099 - 1106
  • [42] The chance-constrained linear programming method in determining reservoir storage capacity and operation policy
    Yurtal, R.
    Turkish Journal of Engineering and Environmental Sciences, 1997, 21 (03): : 155 - 160
  • [43] A coordinated operation strategy for integrated energy microgrid clusters based on chance-constrained programming
    Su, Lei
    Li, Zhenkun
    Zhang, Zhiquan
    Du, Yang
    Ge, Xiaolin
    Yang, Xingang
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2021, 49 (14): : 123 - 131
  • [44] Optimal groundwater remediation design by Chance-Constrained Programming
    Lin, YF
    Sawyer, CS
    GROUNDWATER: AN ENDANGERED RESOURCE, 1997, : 174 - 179
  • [45] RELIABILITY OF A STRUCTURE USING CHANCE-CONSTRAINED PROGRAMMING.
    Gen, Mashiro
    Seguchi, Yasuyuki
    Iwatsubo, Takuzo
    1978, 21 (151): : 37 - 43
  • [46] Optimizing Supplier Selection with Disruptions by Chance-Constrained Programming
    Zang, Wenjuan
    Liu, Yankui
    Li, Zhenhong
    ADVANCES IN SWARM INTELLIGENCE, ICSI 2012, PT II, 2012, 7332 : 108 - 116
  • [47] INTERPRETING GOAL ATTAINMENT IN CHANCE-CONSTRAINED GOAL PROGRAMMING
    NEWTON, K
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1985, 13 (01): : 75 - 78
  • [48] Reconstruction of geological surfaces using chance-constrained programming
    Shi-Cheng Yu
    Cai Lu
    Guang-Min Hu
    Applied Geophysics, 2019, 16 : 125 - 136
  • [50] ON ACCURATE LINEAR-APPROXIMATIONS FOR CHANCE-CONSTRAINED PROGRAMMING
    SEPPALA, Y
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (07) : 693 - 694