Parallel chance-constrained dynamic programming for cascade hydropower system operation

被引:35
|
作者
Liu, Benxi [1 ,2 ,3 ]
Cheng, Chuntian [1 ,3 ]
Wang, Sen [4 ]
Liao, Shengli [1 ,3 ]
Chau, Kwok-Wing [5 ]
Wu, Xinyu [1 ,3 ]
Li, Weidong [6 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Elect Engn Postdoctoral Stn, Dalian 116024, Peoples R China
[3] Dalian Univ Technol, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat, Dalian 116024, Peoples R China
[4] Pearl River Hydraul Res Inst, Guangzhou 510611, Guangdong, Peoples R China
[5] Hong Kong Polytech Univ, Dept Civil & Environm Engn, Hong Kong, Hong Kong, Peoples R China
[6] Dalian Univ Technol, Sch Elect Engn, Dalian 116024, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Chance-constrained dynamic programming; Parallel programming; Reliability; Extreme system failure; Cascade hydropower system; PARTICLE SWARM OPTIMIZATION; UNIT COMMITMENT; ENERGY SYSTEM; MODEL; DESIGN; GENERATION; RESERVOIRS; FUZZY; RULES; SIMULATION;
D O I
10.1016/j.energy.2018.09.140
中图分类号
O414.1 [热力学];
学科分类号
摘要
With continuing development of hydropower in China, cascade hydropower system will account for more in the power grid, and may increase power grid operation risk under global climate change. This paper presents a parallel chance-constrained dynamic programming model to derive optimal operating policies for a cascade hydropower system in China. The innovation work of this paper is mainly embodied in two aspects. First, the reliabilities of meeting the firm power requirements of the cascade hydropower system and avoiding extreme system failure under extreme events are explicitly embedded in the model using Lagrangian duality theory and a penalty function. Multiple operating policies are generated by updating the values of Lagrangian multiplier and penalty coefficient for system disruption, then best operating rules are selected based on system performance and evaluated according to simulated reliability, extreme system failure, and maximum benefit. Second, the Fork/Join parallel framework is deployed to parallelize the chance-constrained dynamic programming in a multi-core environment for improving computational efficiency. Two computing platforms with contrasting configurations are employed to illustrate the parallelization performance. Results from a cascade hydropower system operation demonstrate that the proposed method is computationally efficient and can obtain satisfying operating policies, especially for extreme drought events. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:752 / 767
页数:16
相关论文
共 50 条
  • [31] On mixing sets arising in chance-constrained programming
    Kuecuekyavuz, Simge
    MATHEMATICAL PROGRAMMING, 2012, 132 (1-2) : 31 - 56
  • [32] Weak Structural Dependence in Chance-Constrained Programming
    Houda, Michal
    PROCEEDINGS OF THE 26TH INTERNATIONAL CONFERENCE ON MATHEMATICAL METHODS IN ECONOMICS 2008, 2008, : 201 - 206
  • [33] RELIABILITY OF A STRUCTURE USING CHANCE-CONSTRAINED PROGRAMMING
    HYON, CH
    SEGUCHI, Y
    IWATSUBO, T
    BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1978, 21 (151): : 37 - 43
  • [34] Chance-constrained programming with fuzzy stochastic coefficients
    Aiche, Farid
    Abbas, Moncef
    Dubois, Didier
    FUZZY OPTIMIZATION AND DECISION MAKING, 2013, 12 (02) : 125 - 152
  • [35] Chance-constrained programming with fuzzy stochastic coefficients
    Farid Aiche
    Moncef Abbas
    Didier Dubois
    Fuzzy Optimization and Decision Making, 2013, 12 : 125 - 152
  • [36] A LINEAR-APPROXIMATION FOR CHANCE-CONSTRAINED PROGRAMMING
    OLSON, DL
    SWENSETH, SR
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1987, 38 (03) : 261 - 267
  • [37] Archimedean Copulas in Joint Chance-Constrained Programming
    Houda, Michal
    Lisser, Abdel
    OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS, ICORES 2014, 2015, 509 : 126 - 139
  • [38] Cloud-Based Multidimensional Parallel Dynamic Programming Algorithm for a Cascade Hydropower System
    Yufei Ma
    Ping-an Zhong
    Bin Xu
    Feilin Zhu
    Jieyu Li
    Han Wang
    Qingwen Lu
    Water Resources Management, 2021, 35 : 2705 - 2721
  • [39] Cloud-Based Multidimensional Parallel Dynamic Programming Algorithm for a Cascade Hydropower System
    Ma, Yufei
    Zhong, Ping-an
    Xu, Bin
    Zhu, Feilin
    Li, Jieyu
    Wang, Han
    Lu, Qingwen
    WATER RESOURCES MANAGEMENT, 2021, 35 (09) : 2705 - 2721
  • [40] Chance-Constrained Optimal Hedging Rules for Cascaded Hydropower Reservoirs
    Zeng, Yun
    Wu, Xinyu
    Cheng, Chuntian
    Wang, Yuqian
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (07)