Parallel chance-constrained dynamic programming for cascade hydropower system operation

被引:35
|
作者
Liu, Benxi [1 ,2 ,3 ]
Cheng, Chuntian [1 ,3 ]
Wang, Sen [4 ]
Liao, Shengli [1 ,3 ]
Chau, Kwok-Wing [5 ]
Wu, Xinyu [1 ,3 ]
Li, Weidong [6 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Elect Engn Postdoctoral Stn, Dalian 116024, Peoples R China
[3] Dalian Univ Technol, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat, Dalian 116024, Peoples R China
[4] Pearl River Hydraul Res Inst, Guangzhou 510611, Guangdong, Peoples R China
[5] Hong Kong Polytech Univ, Dept Civil & Environm Engn, Hong Kong, Hong Kong, Peoples R China
[6] Dalian Univ Technol, Sch Elect Engn, Dalian 116024, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Chance-constrained dynamic programming; Parallel programming; Reliability; Extreme system failure; Cascade hydropower system; PARTICLE SWARM OPTIMIZATION; UNIT COMMITMENT; ENERGY SYSTEM; MODEL; DESIGN; GENERATION; RESERVOIRS; FUZZY; RULES; SIMULATION;
D O I
10.1016/j.energy.2018.09.140
中图分类号
O414.1 [热力学];
学科分类号
摘要
With continuing development of hydropower in China, cascade hydropower system will account for more in the power grid, and may increase power grid operation risk under global climate change. This paper presents a parallel chance-constrained dynamic programming model to derive optimal operating policies for a cascade hydropower system in China. The innovation work of this paper is mainly embodied in two aspects. First, the reliabilities of meeting the firm power requirements of the cascade hydropower system and avoiding extreme system failure under extreme events are explicitly embedded in the model using Lagrangian duality theory and a penalty function. Multiple operating policies are generated by updating the values of Lagrangian multiplier and penalty coefficient for system disruption, then best operating rules are selected based on system performance and evaluated according to simulated reliability, extreme system failure, and maximum benefit. Second, the Fork/Join parallel framework is deployed to parallelize the chance-constrained dynamic programming in a multi-core environment for improving computational efficiency. Two computing platforms with contrasting configurations are employed to illustrate the parallelization performance. Results from a cascade hydropower system operation demonstrate that the proposed method is computationally efficient and can obtain satisfying operating policies, especially for extreme drought events. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:752 / 767
页数:16
相关论文
共 50 条
  • [21] Stochastic optimization model for the short-term joint operation of photovoltaic power and hydropower plants based on chance-constrained programming
    Yuan, Wenlin
    Wang, Xinqi
    Su, Chengguo
    Cheng, Chuntian
    Liu, Zhe
    Wu, Zening
    ENERGY, 2021, 222
  • [22] AN ACCEPTANCE REGION THEORY FOR CHANCE-CONSTRAINED PROGRAMMING
    CHARNES, A
    KIRBY, MJL
    RAIKE, WM
    JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 1970, 32 (01) : 38 - &
  • [23] An algorithm for fuzzy random chance-constrained programming
    Wang, H
    Zhao, RQ
    Ning, YF
    PROCEEDINGS OF THE FIFTH IASTED INTERNATIONAL CONFERENCE ON MODELLING, SIMULATION, AND OPTIMIZATION, 2005, : 151 - 154
  • [24] Chance-constrained programming on sugeno measure space
    Zhang, Hong
    Ha, Minghu
    Xing, Hongjie
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (09) : 11527 - 11533
  • [25] Redefining chance-constrained programming in fuzzy environment
    Chakraborty, D
    FUZZY SETS AND SYSTEMS, 2002, 125 (03) : 327 - 333
  • [26] JOINT RANDOMIZED DECISIONS IN CHANCE-CONSTRAINED PROGRAMMING
    BHATTACHARYYA, M
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1984, 35 (04) : 355 - 357
  • [27] ON THE BAYESABILITY OF CHANCE-CONSTRAINED PROGRAMMING-PROBLEMS
    LAVALLE, IH
    OPERATIONS RESEARCH LETTERS, 1986, 4 (06) : 281 - 283
  • [28] Optimal Dispatch Based on Chance-constrained Programming
    Zeng, Kaiwen
    Pan, Mengqi
    Li, Bo
    Liu, Jianing
    Wang, Qi
    Guo, Yufeng
    2018 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2018,
  • [29] On mixing sets arising in chance-constrained programming
    Simge Küçükyavuz
    Mathematical Programming, 2012, 132 : 31 - 56
  • [30] A note on the use of copulas in chance-constrained programming
    Houda, Michal
    MATHEMATICAL METHODS IN ECONOMICS (MME 2014), 2014, : 327 - 332