Parallel chance-constrained dynamic programming for cascade hydropower system operation

被引:35
|
作者
Liu, Benxi [1 ,2 ,3 ]
Cheng, Chuntian [1 ,3 ]
Wang, Sen [4 ]
Liao, Shengli [1 ,3 ]
Chau, Kwok-Wing [5 ]
Wu, Xinyu [1 ,3 ]
Li, Weidong [6 ]
机构
[1] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Elect Engn Postdoctoral Stn, Dalian 116024, Peoples R China
[3] Dalian Univ Technol, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat, Dalian 116024, Peoples R China
[4] Pearl River Hydraul Res Inst, Guangzhou 510611, Guangdong, Peoples R China
[5] Hong Kong Polytech Univ, Dept Civil & Environm Engn, Hong Kong, Hong Kong, Peoples R China
[6] Dalian Univ Technol, Sch Elect Engn, Dalian 116024, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Chance-constrained dynamic programming; Parallel programming; Reliability; Extreme system failure; Cascade hydropower system; PARTICLE SWARM OPTIMIZATION; UNIT COMMITMENT; ENERGY SYSTEM; MODEL; DESIGN; GENERATION; RESERVOIRS; FUZZY; RULES; SIMULATION;
D O I
10.1016/j.energy.2018.09.140
中图分类号
O414.1 [热力学];
学科分类号
摘要
With continuing development of hydropower in China, cascade hydropower system will account for more in the power grid, and may increase power grid operation risk under global climate change. This paper presents a parallel chance-constrained dynamic programming model to derive optimal operating policies for a cascade hydropower system in China. The innovation work of this paper is mainly embodied in two aspects. First, the reliabilities of meeting the firm power requirements of the cascade hydropower system and avoiding extreme system failure under extreme events are explicitly embedded in the model using Lagrangian duality theory and a penalty function. Multiple operating policies are generated by updating the values of Lagrangian multiplier and penalty coefficient for system disruption, then best operating rules are selected based on system performance and evaluated according to simulated reliability, extreme system failure, and maximum benefit. Second, the Fork/Join parallel framework is deployed to parallelize the chance-constrained dynamic programming in a multi-core environment for improving computational efficiency. Two computing platforms with contrasting configurations are employed to illustrate the parallelization performance. Results from a cascade hydropower system operation demonstrate that the proposed method is computationally efficient and can obtain satisfying operating policies, especially for extreme drought events. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:752 / 767
页数:16
相关论文
共 50 条
  • [1] Reservoir operation for hydropower optimization: A chance-constrained approach
    Sreenivasan, KR
    Vedula, S
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 1996, 21 : 503 - 510
  • [2] Joint Chance-Constrained Dynamic Programming
    Ono, Masahiro
    Kuwata, Yoshiaki
    Balaram, J.
    2012 IEEE 51ST ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2012, : 1915 - 1922
  • [3] Optimal Dispatch of Hydropower Stations based on Chance-Constrained Programming
    Zhang, Xuan
    Wei, Hua
    Su, Xianxin
    Gao, Wei
    Chen, Danlei
    Hu, Faxiang
    2021 POWER SYSTEM AND GREEN ENERGY CONFERENCE (PSGEC), 2021, : 420 - 424
  • [4] CHANCE-CONSTRAINED PROGRAMMING
    CHARNES, A
    COOPER, WW
    MANAGEMENT SCIENCE, 1959, 6 (01) : 73 - 79
  • [5] A NOTE ON CHANCE-CONSTRAINED PROGRAMMING
    HEILMANN, WR
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1983, 34 (06) : 533 - 537
  • [6] Research of Optimal Hosting Capacity of Small Hydropower on the Basis of Chance-constrained Programming
    Xiao, Yong
    Xing, Nannan
    Wen, Xiankui
    Chen, Jianguo
    Lin, Chenghui
    Xu, Changbao
    Tang, Jianxing
    INTERNATIONAL CONFERENCE ON ELECTRICAL AND CONTROL ENGINEERING (ICECE 2015), 2015, : 330 - 336
  • [7] USE OF RISK PREMIUMS IN CHANCE-CONSTRAINED DYNAMIC-PROGRAMMING
    ASKEW, AJ
    WATER RESOURCES RESEARCH, 1975, 11 (06) : 862 - 866
  • [8] Dynamic Economic Dispatch for Microgrid Based on the Chance-Constrained Programming
    Huang, Daizheng
    Xie, Lingling
    Wu, Zhihui
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2017, 12 (03) : 1064 - 1072
  • [9] DECOMPOSITION OF NONLINEAR CHANCE-CONSTRAINED PROGRAMMING-PROBLEMS BY DYNAMIC-PROGRAMMING
    MINE, H
    OHNO, K
    FUKUSHIMA, M
    JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 1976, 56 (01) : 211 - 222
  • [10] Fuzzy random chance-constrained programming
    Liu, BD
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2001, 9 (05) : 713 - 720