Comparing post-combustion CO2 capture operation at retrofitted coal-fired power plants in the Texas and Great Britain electric grids

被引:30
|
作者
Cohen, Stuart M. [1 ]
Chalmers, Hannah L. [2 ]
Webber, Michael E. [1 ]
King, Carey W. [3 ]
机构
[1] Univ Texas Austin, Dept Mech Engn, Austin, TX 78712 USA
[2] Univ Edinburgh, Inst Energy Syst, Sch Engn, Edinburgh EH9 3JL, Midlothian, Scotland
[3] Univ Texas Austin, Ctr Int Energy & Environm Policy, Austin, TX 78712 USA
来源
ENVIRONMENTAL RESEARCH LETTERS | 2011年 / 6卷 / 02期
基金
美国国家环境保护局;
关键词
carbon dioxide capture; CO2; carbon capture and sequestration; electricity; coal; FLUE-GAS; PERFORMANCE; STORAGE; COST;
D O I
10.1088/1748-9326/6/2/024001
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This work analyses the carbon dioxide (CO2) capture system operation within the Electric Reliability Council of Texas (ERCOT) and Great Britain (GB) electric grids using a previously developed first-order hourly electricity dispatch and pricing model. The grids are compared in their 2006 configuration with the addition of coal-based CO2 capture retrofits and emissions penalties from 0 to 100 US dollars per metric ton of CO2 (USD/tCO(2)). CO2 capture flexibility is investigated by comparing inflexible CO2 capture systems to flexible ones that can choose between full-and zero-load CO2 capture depending on which operating mode has lower costs or higher profits. Comparing these two grids is interesting because they have similar installed capacity and peak demand, and both are isolated electricity systems with competitive wholesale electricity markets. However, differences in capacity mix, demand patterns, and fuel markets produce diverging behaviours of CO2 capture at coal-fired power plants. Coal-fired facilities are primarily base load in ERCOT for a large range of CO2 prices but are comparably later in the dispatch order in GB and consequently often supply intermediate load. As a result, the ability to capture CO2 is more important for ensuring dispatch of coal-fired facilities in GB than in ERCOT when CO2 prices are high. In GB, higher overall coal prices mean that CO2 prices must be slightly higher than in ERCOT before the emissions savings of CO2 capture offset capture energy costs. However, once CO2 capture is economical, operating CO2 capture on half the coal fleet in each grid achieves greater emissions reductions in GB because the total coal-based capacity is 6 GW greater than in ERCOT. The market characteristics studied suggest greater opportunity for flexible CO2 capture to improve operating profits in ERCOT, but profit improvements can be offset by a flexibility cost penalty.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Process simulation of aqueous MEA plants for post-combustion capture from coal-fired power plants
    Ahn, Hyungwoong
    Luberti, Mauro
    Liu, Zhengyi
    Brandani, Stefano
    [J]. GHGT-11, 2013, 37 : 1523 - 1531
  • [32] Dynamic modelling and analysis of post-combustion CO2 chemical absorption process for coal-fired power plants
    Lawal, A.
    Wang, M.
    Stephenson, P.
    Koumpouras, G.
    Yeung, H.
    [J]. FUEL, 2010, 89 (10) : 2791 - 2801
  • [33] Gas sorption studies on Zeolite Y membrane materials for post-combustion CO2 capture in coal-fired plants
    Snider, Matthew T.
    Verweij, Hendrik
    [J]. MICROPOROUS AND MESOPOROUS MATERIALS, 2014, 192 : 3 - 7
  • [34] HEN optimization for efficient retrofitting of coal-fired power plants with post-combustion carbon capture
    Khalilpour, Rajab
    Abbas, Ali
    [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2011, 5 (02) : 189 - 199
  • [35] Part Load Behaviour of Power Plants with a Retrofitted Post-Combustion CO2 Capture Process
    Roeder, Volker
    Kather, Alfons
    [J]. 7TH TRONDHEIM CONFERENCE ON CO2 CAPTURE, TRANSPORT AND STORAGE (2013), 2014, 51 : 207 - 216
  • [36] Performance analysis of a 500MWe coal-fired power plant with a post-combustion CO2 capture process
    Lee, Ji Hyun
    Kwak, No Sang
    Lee, In-Young
    Jang, Kyung-Ryoung
    Shim, Jae-Goo
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2013, 227 (03) : 149 - 156
  • [37] China baseline coal-fired power plant with post-combustion CO2 capture: 1. Definitions and performance
    Cui, Qian
    Lu, Haoren
    Li, Chufu
    Singh, Surinder
    Ba, Liming
    Zhao, Xinglei
    Ku, Anthony Y.
    [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2018, 78 : 37 - 47
  • [38] Performance and economic analysis of commercial-scale coal-fired power plant with post-combustion CO2 capture
    Lee, Ji Hyun
    Kwak, No Sang
    Lee, In Young
    Jang, Kyung Ryoung
    Lee, Dong Woog
    Jang, Se Gyu
    Kim, Byung Kook
    Shim, Jae-Goo
    [J]. KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2015, 32 (05) : 800 - 807
  • [39] Performance and economic analysis of commercial-scale coal-fired power plant with post-combustion CO2 capture
    Ji Hyun Lee
    No Sang Kwak
    In Young Lee
    Kyung Ryoung Jang
    Dong Woog Lee
    Se Gyu Jang
    Byung Kook Kim
    Jae-Goo Shim
    [J]. Korean Journal of Chemical Engineering, 2015, 32 : 800 - 807
  • [40] Performance and Economic Analysis of 500 MWe Coal-Fired Power Plant with Post-Combustion CO2 Capture Process
    Lee, Ji Hyun
    Kim, Jun-Han
    Lee, In Young
    Jang, Kyung Ryoung
    Shim, Jae-Goo
    [J]. KOREAN CHEMICAL ENGINEERING RESEARCH, 2011, 49 (02): : 244 - 249