Performance analysis of a 500MWe coal-fired power plant with a post-combustion CO2 capture process

被引:4
|
作者
Lee, Ji Hyun [1 ]
Kwak, No Sang [1 ]
Lee, In-Young [1 ]
Jang, Kyung-Ryoung [1 ]
Shim, Jae-Goo [1 ]
机构
[1] KEPCO Res Inst, Technol Commercializat Off, Taejon, South Korea
关键词
CO2; capture; chemical absorption; flue gas; energy penalty; power plant;
D O I
10.1177/0954408912445855
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
In this study, a performance analysis of a 500MWe coal-fired power plant with a post-combustion CO2 capture system was performed. The amine-based chemical absorption process was considered as a base CO2 capture system. Based on the design conditions of the flue gas from the supercritical coal-fired power plant operating in the Republic of Korea, the energy consumption of the CO2 capture system was simulated using a process simulator. The simulation of the CO2 capture system was undertaken using Aspen Plus software with ELECNRTL property packages; based on these results, the energy requirement of the CO2 capture system and the overall efficiency of a power plant with the CO2 capture system was estimated. It was observed that the thermal energy required to regenerate the solvent reduces the efficiency of the power plant by 8.36%, the energy required to compress the CO2 from 0.1 to 11MPa is the next largest factor, reducing the efficiency by 3.59%, and the other energy requirement amounts to 0.45%.
引用
收藏
页码:149 / 156
页数:8
相关论文
共 50 条
  • [1] Performance and Economic Analysis of 500 MWe Coal-Fired Power Plant with Post-Combustion CO2 Capture Process
    Lee, Ji Hyun
    Kim, Jun-Han
    Lee, In Young
    Jang, Kyung Ryoung
    Shim, Jae-Goo
    [J]. KOREAN CHEMICAL ENGINEERING RESEARCH, 2011, 49 (02): : 244 - 249
  • [2] Performance and Economic Analysis of Domestic Supercritical Coal-Fired Power Plant with Post-Combustion CO2 Capture Process
    Lee, Ji-Hyun
    Kwak, No-Sang
    Lee, In-Young
    Jang, Kyung-Ryoung
    Shim, Jae-Goo
    [J]. KOREAN CHEMICAL ENGINEERING RESEARCH, 2012, 50 (02): : 365 - 370
  • [3] Techno-economic analysis of a 300 MWe coal-fired power plant retrofitted with post-combustion CO2 capture
    Zhang, Dan
    Xu, Minghou
    Li, Aijun
    [J]. ASIA-PACIFIC JOURNAL OF CHEMICAL ENGINEERING, 2012, 7 : S201 - S208
  • [4] Thermodynamic Analysis of a 500-MWe Subcritical Coal-Fired Thermal Power Plant with Solar-Aided Post-Combustion CO2 Capture
    Kumar, Rajesh
    Anand, Ravi
    Karmakar, Sujit
    [J]. ADVANCES IN MECHANICAL ENGINEERING, ICRIDME 2018, 2020, : 907 - 919
  • [5] Hybrid membrane process for post-combustion CO2 capture from coal-fired power plant
    Ren, Li-Xuan
    Chang, Feng-Ling
    Kang, Dun-Yen
    Chen, Cheng-Liang
    [J]. Journal of Membrane Science, 2021, 603
  • [6] Performance and economic analysis of commercial-scale coal-fired power plant with post-combustion CO2 capture
    Lee, Ji Hyun
    Kwak, No Sang
    Lee, In Young
    Jang, Kyung Ryoung
    Lee, Dong Woog
    Jang, Se Gyu
    Kim, Byung Kook
    Shim, Jae-Goo
    [J]. KOREAN JOURNAL OF CHEMICAL ENGINEERING, 2015, 32 (05) : 800 - 807
  • [7] Performance and economic analysis of commercial-scale coal-fired power plant with post-combustion CO2 capture
    Ji Hyun Lee
    No Sang Kwak
    In Young Lee
    Kyung Ryoung Jang
    Dong Woog Lee
    Se Gyu Jang
    Byung Kook Kim
    Jae-Goo Shim
    [J]. Korean Journal of Chemical Engineering, 2015, 32 : 800 - 807
  • [8] Simulation of the Carbonate Looping Process for Post-Combustion CO2 Capture from a Coal-Fired Power Plant
    Stroehle, Jochen
    Lasheras, Ana
    Galloy, Alexander
    Epple, Bernd
    [J]. CHEMICAL ENGINEERING & TECHNOLOGY, 2009, 32 (03) : 435 - 442
  • [9] A review of efficiency penalty in a coal-fired power plant with post-combustion CO2 capture
    Goto, Kazuya
    Yogo, Katsunori
    Higashii, Takayuki
    [J]. APPLIED ENERGY, 2013, 111 : 710 - 720
  • [10] Coal-fired power plant with calcium oxide carbonation for post-combustion CO2 capture
    Romano, Matteo
    [J]. GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01): : 1099 - 1106