A two-stage heuristic for the sequence-dependent job sequencing and tool switching problem

被引:8
|
作者
Rifai, Achmad Pratama [1 ]
Mara, Setyo Tri Windras [1 ]
Norcahyo, Rachmadi [1 ]
机构
[1] Univ Gadjah Mada, Fac Engn, Dept Mech & Ind Engn, Yogyakarta, Indonesia
关键词
Flexible manufacturing machine; Job sequencing and tool switching; Sequence-dependent setup time; Adaptive large neighborhood search; Simulated annealing; LARGE NEIGHBORHOOD SEARCH; ITERATED LOCAL SEARCH; HYBRID METHOD; MACHINE; OPTIMIZATION; MINIMIZATION; ALGORITHMS; SETUP; MODELS; NUMBER;
D O I
10.1016/j.cie.2021.107813
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The job sequencing and tool switching problem is a combinatorial optimization problem that commonly happens in a flexible manufacturing system environment. In this type of environment, a set of flexible manufacturing machines can be configured with various tools to process different jobs and the requirement to switch tools may correspond to a reduction of productivity. Consequently, research on the job sequencing and tool switching problem has been concentrated on minimizing the number of tools switches. This paper discusses the sequencedependent job sequencing and tool switching problem. The sequence-dependent job sequencing and tool switching problem extends the standard model by considering non-uniform setup times since industrial applications indicate that a tool setup time might be influenced by the previously installed tool at the same magazine slot. A two-stage heuristic procedure is developed here. In the first stage, an adaptive large neighborhood search is deployed for finding the near-optimal job sequence. Then, in the second stage, a combination of the Keep Tool Needed Soonest policy and simulated annealing is proposed for the tooling sub-problem. Comprehensive computational experiments are carried out to demonstrate the efficacy and robustness of the proposed method for solving the sequence-dependent job sequencing and tool switching problem.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing
    Ahmadov, Yashar
    Helo, Petri
    ANNALS OF OPERATIONS RESEARCH, 2018, 270 (1-2) : 5 - 24
  • [22] An Effective Heuristic for the No-Wait Flowshop with Sequence-Dependent Setup Times Problem
    Araujo, Daniella Castro
    Nagano, Marcelo Seido
    ADVANCES IN ARTIFICIAL INTELLIGENCE, MICAI 2010, PT I, 2010, 6437 : 187 - 196
  • [23] A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times
    Angel-Bello, Francisco
    Alvarez, Ada
    Pacheco, Joaquin
    Martinez, Iris
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2011, 61 (04) : 797 - 808
  • [24] An effective two-stage heuristic for scheduling the distributed assembly flowshops with sequence dependent setup times
    Song, Hong-Bo
    Lin, Jian
    Chen, You-Rong
    Computers and Operations Research, 2025, 173
  • [25] A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine
    Stecco, Gabriella
    Cordeau, Jean-Francois
    Moretti, Elena
    JOURNAL OF SCHEDULING, 2009, 12 (01) : 3 - 16
  • [26] Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups
    Wang, Shasha
    Kurz, Mary
    Mason, Scott Jennings
    Rashidi, Eghbal
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (22) : 6893 - 6907
  • [27] A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine
    Gabriella Stecco
    Jean-François Cordeau
    Elena Moretti
    Journal of Scheduling, 2009, 12 : 3 - 16
  • [28] Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times
    Wang, Shijin
    Wang, Xiaodong
    Yu, Li
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2020, 7 (03) : 291 - 307
  • [29] Metaheuristic solutions to the "Job shop scheduling problem with sequence-dependent setup times"
    Gonzalez, Miguel A.
    AI COMMUNICATIONS, 2013, 26 (04) : 419 - 421
  • [30] A new two-stage heuristic for the recreational vehicle scheduling problem
    Kulkarni, Sarang
    Patil, Rahul
    Krishnamoorthy, Mohan
    Ernst, Andreas
    Ranade, Abhiram
    COMPUTERS & OPERATIONS RESEARCH, 2018, 91 : 59 - 78