共 50 条
- [22] An Effective Heuristic for the No-Wait Flowshop with Sequence-Dependent Setup Times Problem ADVANCES IN ARTIFICIAL INTELLIGENCE, MICAI 2010, PT I, 2010, 6437 : 187 - 196
- [24] An effective two-stage heuristic for scheduling the distributed assembly flowshops with sequence dependent setup times Computers and Operations Research, 2025, 173
- [27] A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine Journal of Scheduling, 2009, 12 : 3 - 16