A two-stage heuristic for the sequence-dependent job sequencing and tool switching problem

被引:8
|
作者
Rifai, Achmad Pratama [1 ]
Mara, Setyo Tri Windras [1 ]
Norcahyo, Rachmadi [1 ]
机构
[1] Univ Gadjah Mada, Fac Engn, Dept Mech & Ind Engn, Yogyakarta, Indonesia
关键词
Flexible manufacturing machine; Job sequencing and tool switching; Sequence-dependent setup time; Adaptive large neighborhood search; Simulated annealing; LARGE NEIGHBORHOOD SEARCH; ITERATED LOCAL SEARCH; HYBRID METHOD; MACHINE; OPTIMIZATION; MINIMIZATION; ALGORITHMS; SETUP; MODELS; NUMBER;
D O I
10.1016/j.cie.2021.107813
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The job sequencing and tool switching problem is a combinatorial optimization problem that commonly happens in a flexible manufacturing system environment. In this type of environment, a set of flexible manufacturing machines can be configured with various tools to process different jobs and the requirement to switch tools may correspond to a reduction of productivity. Consequently, research on the job sequencing and tool switching problem has been concentrated on minimizing the number of tools switches. This paper discusses the sequencedependent job sequencing and tool switching problem. The sequence-dependent job sequencing and tool switching problem extends the standard model by considering non-uniform setup times since industrial applications indicate that a tool setup time might be influenced by the previously installed tool at the same magazine slot. A two-stage heuristic procedure is developed here. In the first stage, an adaptive large neighborhood search is deployed for finding the near-optimal job sequence. Then, in the second stage, a combination of the Keep Tool Needed Soonest policy and simulated annealing is proposed for the tooling sub-problem. Comprehensive computational experiments are carried out to demonstrate the efficacy and robustness of the proposed method for solving the sequence-dependent job sequencing and tool switching problem.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
    Hwang, F. J.
    Lin, B. M. T.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (06) : 839 - 845
  • [42] A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
    Dominik Kress
    David Müller
    Jenny Nossack
    OR Spectrum, 2019, 41 : 179 - 217
  • [43] The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times
    Bruni, M. E.
    Khodaparasti, S.
    Demeulemeester, E.
    COMPUTERS & OPERATIONS RESEARCH, 2020, 123
  • [44] A worker constrained flexible job shop scheduling problem with sequence-dependent setup times
    Kress, Dominik
    Mueller, David
    Nossack, Jenny
    OR SPECTRUM, 2019, 41 (01) : 179 - 217
  • [45] A branch and bound method for the job-shop problem with sequence-dependent setup times
    Artigues, Christian
    Feillet, Dominique
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 135 - 159
  • [46] A branch and bound method for the job-shop problem with sequence-dependent setup times
    Christian Artigues
    Dominique Feillet
    Annals of Operations Research, 2008, 159 : 135 - 159
  • [47] A new exact solution algorithm for the job shop problem with sequence-dependent setup times
    Artigues, C
    Belmokhtar, S
    Feillet, D
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2004, 3011 : 37 - 49
  • [48] Lagrangian Bounds and a Heuristic for the Two-Stage Capacitated Facility Location Problem
    Litvinchev, Igor
    Ozuna, Edith L.
    INTERNATIONAL JOURNAL OF ENERGY OPTIMIZATION AND ENGINEERING, 2012, 1 (01) : 59 - 71
  • [49] Heuristic approaches to solve a two-stage lot sizing and scheduling problem
    Pinho Schimidt, Talita Mariana
    Cassius Tadeu, Scarpin
    Valentim Loch, Gustavo
    Schenekemberg, Cleder Marcos
    IEEE LATIN AMERICA TRANSACTIONS, 2019, 17 (03) : 434 - 443
  • [50] A Two-Stage Hybrid Heuristic for Vehical Routing Problem with Pickups and Deliveries
    Hong, Bigang
    Liu, Changshi
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, PROCEEDINGS, 2009, : 92 - +