A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing

被引:22
|
作者
Ahmadov, Yashar [1 ]
Helo, Petri [1 ]
机构
[1] Univ Vaasa, Networked Value Syst, Dept Prod, POB 700, Vaasa 65101, Finland
关键词
Big data analytics; Sequence-dependent setup; Heuristics; Job scheduling; BIG DATA; CHANGEOVER TIMES; UP TIMES; SYSTEM;
D O I
10.1007/s10479-016-2304-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a prototype system of sheet metal processing machinery which collects production order data, passes current information to cloud based centralized job scheduling for setup time reduction and updates the production calendar accordingly. A centralized cloud service can collect and analyse production order data for machines and suggest optimized schedules. This paper explores the application of sequencing algorithms in the sheet metal forming industry, which faces sequence-dependent changeover times on single machine systems. We analyse the effectiveness of using such algorithms in the reduction of total setup times. We describe alternative models: Clustering, Nearest Neighbourhood and Travelling Salesman Problem, and then apply them to real data obtained from a manufacturing company, as well as to randomly generated data sets. Based on the prototype implementation clustering algorithm was proposed for actual implementation. Sequence-dependency increases the complexity of the scheduling problems; thus, effective approaches are required to solve them. The algorithms proposed in this paper provide efficient solutions to these types of sequencing problems.
引用
收藏
页码:5 / 24
页数:20
相关论文
共 50 条
  • [1] A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing
    Yashar Ahmadov
    Petri Helo
    Annals of Operations Research, 2018, 270 : 5 - 24
  • [2] ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
    Lin, Shih-Wei
    Ying, Kuo-Ching
    COMPUTERS & OPERATIONS RESEARCH, 2014, 51 : 172 - 181
  • [3] Scheduling job shop problems with sequence-dependent setup times
    Naderi, B.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (21) : 5959 - 5976
  • [4] Domino sequencing: Scheduling with state-based sequence-dependent setup times
    Diessel, Erik
    Ackermann, Heiner
    OPERATIONS RESEARCH LETTERS, 2019, 47 (04) : 274 - 280
  • [5] Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times
    Sharma P.
    Jain A.
    Frontiers of Mechanical Engineering, 2014, 9 (4) : 380 - 389
  • [6] Job Shop Scheduling with Sequence-Dependent Setup Times Based on Constraint Programming Approach
    Peng, Yun-fang
    PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 835 - 841
  • [7] New setup-oriented dispatching rules for a stochastic dynamic job shop manufacturing system with sequence-dependent setup times
    Sharma, Pankaj
    Jain, Ajai
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2016, 24 (01): : 58 - 68
  • [8] Scheduling sequence-dependent setup time job shops with preventive maintenance
    B. Naderi
    M. Zandieh
    S. M. T. Fatemi Ghomi
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 170 - 181
  • [9] Scheduling sequence-dependent setup time job shops with preventive maintenance
    Naderi, B.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 170 - 181
  • [10] Multiobjective Sequence-Dependent Job Sequencing and Tool Switching Problem
    Rifai, Achmad Pratama
    Sutoyo, Edi
    Mara, Setyo Tri Windras
    Dawal, Siti Zawiah Md
    IEEE SYSTEMS JOURNAL, 2023, 17 (01): : 1395 - 1406