Improved Approaches to Minimize the Makespan on Single-Machine Scheduling with Periodic Preventive Maintenance Activities

被引:1
|
作者
Zhou, Hongming [1 ]
Tsai, Ya-Chih [2 ]
Wu, Ful-Chiang [2 ]
Huang, Shenquan [1 ]
Chou, Fuh-Der [1 ]
机构
[1] Wenzhou Univ, Coll Mech & Elect Engn, Wenzhou 325035, Zhejiang, Peoples R China
[2] Vanung Univ, Dept Hotel Management, Taoyuan, Taiwan
基金
中国国家自然科学基金;
关键词
TOTAL COMPLETION-TIME; DETERIORATING JOBS; ALGORITHM;
D O I
10.1155/2020/8548463
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a single-machine scheduling problem with periodic preventive maintenance activities that are predeterministic so that the machine is not available all the time, and jobs have to be processed between two consecutive maintenance periods. We propose a mixed integer programming (MIP) model and two heuristics to minimize the makespan. With more constraints in our model, the model is more efficient than the recent model of Perez-Gonzalez and Framinan , and our model could solve problems with up to fifty jobs. Two heuristic algorithms, namely, H (MW) and H (LB*), are also proposed, in which two bin-packing policies of the minimum waste and minimum lower bound are used, respectively. Furthermore, we also proposed an improvement procedure. The results showed that the heuristic H (MW) outperformed other heuristics of the paper, indicating that the bin-packing policy of the minimum waste is more effective than well-known ones such as full batch and best fit. Additionally, all the heuristic algorithms addressed in this paper combined with the improvement procedure could achieve a similar and high quality of solutions with a very tiny increase in computational expense.
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Single machine scheduling with job delivery to minimize makespan
    Lu, Lingfa
    Yuan, Jinjiang
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2008, 25 (01) : 1 - 10
  • [32] Scheduling deteriorating jobs to minimize the makespan on a single machine
    Chin-Chia Wu
    Yau-Ren Shiau
    Ling-Huei Lee
    Wen-Chiung Lee
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 1230 - 1236
  • [33] Scheduling deteriorating jobs to minimize the makespan on a single machine
    Wu, Chin-Chia
    Shiau, Yau-Ren
    Lee, Ling-Huei
    Lee, Wen-Chiung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (11-12): : 1230 - 1236
  • [34] Single-machine scheduling of two activities with slack: CPM to minimize the total tardiness
    North China Electric Power University, Beijing 102206, China
    J. Harbin Inst. Technol., 2007, 1 (97-100):
  • [35] Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
    Allaoui, H.
    Lamouri, S.
    Artiba, A.
    Aghezzaf, E.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) : 161 - 167
  • [36] Single-Machine Production Scheduling Integrated Preventive Maintance Planning for Minimizing Makespan and Flow Time
    Xu, Shengliang
    Wang, Liya
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 1513 - 1517
  • [37] The single-machine parallel-batching on-line scheduling problem with family jobs to minimize makespan
    Nong, Qingqin
    Yuan, Jinjiang
    Fu, Ruyan
    Lin, Lin
    Tian, Ji
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) : 435 - 440
  • [38] Stochastic single-machine scheduling with workload-dependent maintenance activities
    Gu, Manzhan
    Yang, Weitao
    Liu, Peihai
    OPTIMIZATION LETTERS, 2024, 18 (08) : 1925 - 1947
  • [39] Single-machine scheduling with maintenance and repair rate-modifying activities
    Lee, CY
    Lin, CS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 135 (03) : 493 - 513
  • [40] Single-machine scheduling problem with flexible maintenance and non-resumable jobs to minimise makespan
    Chen, Yarong
    Huang, Chenjun
    Chou, Fuh-Der
    Huang, Shenquan
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2020, 2 (04) : 174 - 181