Single-machine scheduling problem with flexible maintenance and non-resumable jobs to minimise makespan

被引:4
|
作者
Chen, Yarong [1 ]
Huang, Chenjun [1 ]
Chou, Fuh-Der [1 ]
Huang, Shenquan [1 ]
机构
[1] Wenzhou Univ, Sch Mech & Elect Engn, Chashan Higher Educ Pk Wenzhou, Wenzhou, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
single machine scheduling; computational complexity; minimisation; combinatorial mathematics; preventive maintenance; job shop scheduling; integer programming; flexible maintenance; nonresumable jobs; single-machine scheduling problem; high-speed heuristic algorithms; makespan minimisation; nondeterministic polynomial-hard combinatorial optimisation problem; mixed-integer programming model; MIP model; branch-and-bound algorithm; B& B algorithm; near-optimal solution; minimum waste and lower bound index;
D O I
10.1049/iet-cim.2020.0014
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Single-machine scheduling problem with preventive maintenance is an non-deterministic polynomial-hard combinatorial optimisation problem, which has significant applications in the real world. To meet the realistic requirements, high-speed heuristic algorithms should be developed. In this study, a single-machine scheduling problem with flexible maintenance and non-resumable jobs is studied. Some properties for optimally solving this problem are first proposed, and then two mixed-integer programming (MIP) models are provided. Next, a branch-and-bound (B&B) algorithm, four heuristic algorithms and the procedures to improve the quality of their solution are developed based on the properties of the optimal solution. Experimental results indicate that the proposed heuristic algorithms can obtain near-optimal solutions within a very short computation time compared with the MIP and B&B methods. The heuristic algorithms of Minimum Waste and Lower Bound Index are particularly satisfactory in terms of both solution efficiency and accuracy in solving the addressed problem.
引用
收藏
页码:174 / 181
页数:8
相关论文
共 50 条
  • [1] Makespan minimization for parallel machine scheduling of semi-resumable and non-resumable jobs with multiple availability constraints
    Beaton, Clifford
    Diallo, Claver
    Gunn, Eldon
    INFOR, 2016, 54 (04) : 305 - 316
  • [2] Open Shop Scheduling Problem with a Non-resumable Flexible Maintenance Period
    Yuan, Yuan
    Han, Xin
    Liu, Xinbo
    Lan, Yan
    COMBINATORIAL OPTIMIZATION AND APPLICATIONS, COCOA 2021, 2021, 13135 : 512 - 526
  • [3] Unrelated parallel machine scheduling under machine availability and eligibility constraints to minimize the makespan of non-resumable jobs
    Kurt, A.
    Cetinkaya, F. C.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2024, 15 (01): : 18 - 33
  • [4] A note on single-machine makespan scheduling with deteriorating jobs and scheduled maintenance
    Lee, Wen-Chiung
    JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2007, 28 (03): : 469 - 477
  • [5] Non-resumable scheduling on a single bounded parallel-batch machine with periodic maintenance
    Fan, Jing
    Shi, Hui
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 43 (05) : 1645 - 1654
  • [6] A single-machine scheduling problem with maintenance activities to minimize makespan
    Hsu, Chou-Jung
    Low, Chinyao
    Su, Chwen-Tzeng
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 215 (11) : 3929 - 3935
  • [7] The Single-Machine Preemptive or Resumable Scheduling with Maintenance Intervals
    He, Ru-Yan
    Yuan, Jin-Jiang
    Zhang, Yuan
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2023,
  • [8] Minimizing Total Weighted Completion Time on a Single Machine Scheduling Problem with Resumable Jobs and Flexible Maintenance
    Tsai, Ya-Chih
    Chen, Yarong
    Chou, Fuh-Der
    ICRAI 2018: PROCEEDINGS OF 2018 4TH INTERNATIONAL CONFERENCE ON ROBOTICS AND ARTIFICIAL INTELLIGENCE -, 2018, : 34 - 39
  • [9] Non-resumable scheduling on a single bounded parallel-batch machine with periodic maintenance
    Jing Fan
    Hui Shi
    Journal of Combinatorial Optimization, 2022, 43 : 1645 - 1654
  • [10] Minimizing the makespan in a single machine scheduling problem with a flexible maintenance
    Yang, Dar-Li
    Hung, Ching-Lien
    Hsu, Chou-Jung
    Chem, Maw-Sheng
    Journal of the Chinese Institute of Industrial Engineers, 2002, 19 (01): : 63 - 66