Improved Approaches to Minimize the Makespan on Single-Machine Scheduling with Periodic Preventive Maintenance Activities

被引:1
|
作者
Zhou, Hongming [1 ]
Tsai, Ya-Chih [2 ]
Wu, Ful-Chiang [2 ]
Huang, Shenquan [1 ]
Chou, Fuh-Der [1 ]
机构
[1] Wenzhou Univ, Coll Mech & Elect Engn, Wenzhou 325035, Zhejiang, Peoples R China
[2] Vanung Univ, Dept Hotel Management, Taoyuan, Taiwan
基金
中国国家自然科学基金;
关键词
TOTAL COMPLETION-TIME; DETERIORATING JOBS; ALGORITHM;
D O I
10.1155/2020/8548463
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a single-machine scheduling problem with periodic preventive maintenance activities that are predeterministic so that the machine is not available all the time, and jobs have to be processed between two consecutive maintenance periods. We propose a mixed integer programming (MIP) model and two heuristics to minimize the makespan. With more constraints in our model, the model is more efficient than the recent model of Perez-Gonzalez and Framinan , and our model could solve problems with up to fifty jobs. Two heuristic algorithms, namely, H (MW) and H (LB*), are also proposed, in which two bin-packing policies of the minimum waste and minimum lower bound are used, respectively. Furthermore, we also proposed an improvement procedure. The results showed that the heuristic H (MW) outperformed other heuristics of the paper, indicating that the bin-packing policy of the minimum waste is more effective than well-known ones such as full batch and best fit. Additionally, all the heuristic algorithms addressed in this paper combined with the improvement procedure could achieve a similar and high quality of solutions with a very tiny increase in computational expense.
引用
收藏
页数:13
相关论文
共 50 条
  • [11] Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan
    Wang, Xiuli
    Cheng, T. C. Edwin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (01) : 57 - 70
  • [12] Single-machine scheduling with flexible and periodic maintenance
    Chen, J. S.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (06) : 703 - 710
  • [13] On single-machine scheduling with flexible maintenance activities
    Xu, Dehua
    Yin, Yunqiang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1139 - 1145
  • [14] On single-machine scheduling with flexible maintenance activities
    Dehua Xu
    Yunqiang Yin
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1139 - 1145
  • [15] Single-machine scheduling with maintenance activities and rejection
    Zou, Juan
    Yuan, Jinjiang
    DISCRETE OPTIMIZATION, 2020, 38
  • [16] Two-agent single-machine scheduling with release dates to minimize the makespan
    Yu, Jin
    Liu, Peihai
    Lu, Xiwen
    OPTIMIZATION LETTERS, 2023, 17 (08) : 1915 - 1937
  • [17] Two-agent single-machine scheduling with release dates to minimize the makespan
    Jin Yu
    Peihai Liu
    Xiwen Lu
    Optimization Letters, 2023, 17 : 1915 - 1937
  • [18] A PTAS for single-machine scheduling with release dates and job delivery to minimize makespan
    Lu, Lingfa
    Zhang, Liqi
    RAIRO-OPERATIONS RESEARCH, 2019, 53 (04) : 1261 - 1266
  • [19] A note on single-machine makespan scheduling with deteriorating jobs and scheduled maintenance
    Lee, Wen-Chiung
    JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2007, 28 (03): : 469 - 477
  • [20] Single-machine scheduling with periodic maintenance and learning effect
    Hui Wu
    Hongmei Zheng
    Scientific Reports, 13