A rule for lead time estimation in general production shops

被引:0
|
作者
Weng, Wei [1 ]
机构
[1] Kanazawa Univ, Inst Liberal Arts & Sci, Kanazawa, Ishikawa, Japan
关键词
lead time estimation; flow time estimation; due date assignment; due date promising; on-time delivery; DUE-DATE ASSIGNMENT;
D O I
10.1109/icphys.2019.8780167
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider the problem of estimating lead times of jobs that arrive dynamically in a production shop. The lead time of a job refers to the duration between the job's arrival and completion. To improve accuracy of estimation and generality of application, we propose a new rule that takes into account parallelization of waiting queues in the system and job-specific sequence of visiting workstations. We carry out extensive experiments to evaluate performance of the rule, and the results suggest that the rule is high-performing in production shops including single-machine shops, parallel-machine shops, flexible flow shops, and flexible job shops. We further provide the mean of best values found for the parameters in the proposed rule under three performance measures: relative error ratio, mean tardiness ratio, and percentage of tardy jobs, respectively, to help users determine the parameters according to their needs.
引用
收藏
页码:581 / 586
页数:6
相关论文
共 50 条
  • [31] INVENTORY CONTROL WITH GENERAL DEMAND AND LEAD TIME DISTRIBUTIONS
    KOTTAS, JF
    LAU, HS
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1979, 10 (05) : 485 - 492
  • [32] LOAD-ORIENTED MANUFACTURING CONTROL JUST-IN-TIME PRODUCTION FOR JOB SHOPS
    BECHTE, W
    PRODUCTION PLANNING & CONTROL, 1994, 5 (03) : 292 - 307
  • [33] Study and Application of Scheduling Method for Just-in-time Production in Flexible Job Shops
    Weng, Wei
    Fujimura, Shigeru
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 318 - 322
  • [34] Lead time and response time in a pull production control system
    Kim, I
    Tang, CS
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 101 (03) : 474 - 485
  • [35] Lead time prediction in unbalanced production systems
    Ruben, RA
    Mahmoodi, F
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (07) : 1711 - 1729
  • [36] Implementation of time offset estimation with General Cell
    Gong, Xiaochun
    Xu, Guodong
    2006 8TH INTERNATIONAL CONFERENCE ON SIGNAL PROCESSING, VOLS 1-4, 2006, : 638 - +
  • [37] PROTHROMBIN-TIME ESTIMATION IN GENERAL PRACTICE
    MILLAR, AE
    MILLAR, A
    BRITISH MEDICAL JOURNAL, 1962, (5289): : 1414 - &
  • [38] From "Bhang Shops" to "Cannabis in Coffee Shops": Time to Debate the Option?
    Balhara, Yatan Pal Singh
    Parmar, Arpit
    Modak, Tamonud
    Vikram, Virendra
    INDIAN JOURNAL OF PSYCHOLOGICAL MEDICINE, 2022, 44 (03) : 285 - 289
  • [39] Production planning and control in repair shops
    Dombrowski U.
    Sendler M.
    1600, Carl Hanser Verlag (111): : 622 - 625
  • [40] DISTRIBUTION OF HARMFUL SUBSTANCES IN PRODUCTION SHOPS
    TISCHENKO, NP
    KHIMIKO-FARMATSEVTICHESKII ZHURNAL, 1987, 21 (03): : 355 - 359