A rule for lead time estimation in general production shops

被引:0
|
作者
Weng, Wei [1 ]
机构
[1] Kanazawa Univ, Inst Liberal Arts & Sci, Kanazawa, Ishikawa, Japan
关键词
lead time estimation; flow time estimation; due date assignment; due date promising; on-time delivery; DUE-DATE ASSIGNMENT;
D O I
10.1109/icphys.2019.8780167
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider the problem of estimating lead times of jobs that arrive dynamically in a production shop. The lead time of a job refers to the duration between the job's arrival and completion. To improve accuracy of estimation and generality of application, we propose a new rule that takes into account parallelization of waiting queues in the system and job-specific sequence of visiting workstations. We carry out extensive experiments to evaluate performance of the rule, and the results suggest that the rule is high-performing in production shops including single-machine shops, parallel-machine shops, flexible flow shops, and flexible job shops. We further provide the mean of best values found for the parameters in the proposed rule under three performance measures: relative error ratio, mean tardiness ratio, and percentage of tardy jobs, respectively, to help users determine the parameters according to their needs.
引用
收藏
页码:581 / 586
页数:6
相关论文
共 50 条
  • [41] RESPONSIBILITY OF PRODUCTION SHOPS FOR PERFORMANCE STANDARDS
    APTEKAR, SS
    DOLGORUK.YA
    KLUSHINA, KD
    ZASOVITS.EP
    COKE & CHEMISTRY USSR, 1969, (12): : 41 - &
  • [42] Estimation of lead time and overdiagnosis in breast cancer screening
    P C Gøtzsche
    K J Jørgensen
    J Mæhlen
    P-H Zahl
    British Journal of Cancer, 2009, 100 : 219 - 219
  • [43] An examination of the relationship between time estimation and time production
    Chelonis, John J.
    Gravelin, Claire R.
    NEUROTOXICOLOGY AND TERATOLOGY, 2009, 31 (04) : 245 - 245
  • [44] TIME-ESTIMATION AND TIME PRODUCTION IN DEPRESSIVE PATIENTS
    KITAMURA, T
    KUMAR, R
    ACTA PSYCHIATRICA SCANDINAVICA, 1983, 68 (01) : 15 - 21
  • [45] Manufacturing lead time estimation using data mining
    Ozturk, Atakan
    Kayaligil, Sinan
    Ozdemirel, Nur E.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (02) : 683 - 700
  • [46] Lead-time and overdiagnosis estimation in neuroblastoma screening
    Spix, C
    Michaelis, J
    Berthold, F
    Erttmann, R
    Sander, J
    Schilling, FH
    STATISTICS IN MEDICINE, 2003, 22 (18) : 2877 - 2892
  • [47] Estimation of lead time and overdiagnosis in breast cancer screening
    Gotzsche, P. C.
    Jorgensen, K. J.
    Maehlen, J.
    Zahl, P-H
    BRITISH JOURNAL OF CANCER, 2009, 100 (01) : 219 - 219
  • [48] Production and cost keeping for machine shops
    Atkins, Paul M.
    UNIVERSITY JOURNAL OF BUSINESS, 1923, 2 (01): : 121 - 121
  • [49] IMPLEMENTING THE LEAD RULE
    NEUKRUG
    KARALEKAS
    GLICKER
    KIRMEYER
    FREY
    MARROCCO
    HESS
    DEHAAS
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1991, 83 (08): : 26 - &